• Encourage the construction workforce to undergo testing (<strong>Azura</strong> and<br />

contractors) for sexually transmitted infections (STIs);<br />

• Develop camp and workforce management protocols that include<br />

workforce behaviour and interactions with local communities. Ensure that<br />

these are clearly communicated to all workforce (both <strong>Azura</strong> and<br />

contractors) and ensure that measures are strictly enforced;<br />

• Develop a Traffic Management Plan that sets out maximum speeds for<br />

Project vehicles, defensive driving techniques, timing of Project vehicle<br />

movements (to avoid busy periods), dust and noise suppression/<br />

management, and establishes a monitoring mechanism to ensure<br />

effectiveness;<br />

• Communicate Project transport plans to communities, along with safety<br />

notices as appropriate;<br />

• Work with the Government to set out parameters around use of security<br />

forces to support the Project, including acceptable force and use of<br />

weapons;<br />

• <strong>Azura</strong> <strong>Power</strong> will ensure that all contractors maintain HSE plans and<br />

contractors HSE plans shall be reviewed for adequacy prior to all contract<br />

awards. All contractors and workers shall be required to comply with<br />

<strong>Azura</strong> <strong>Power</strong>’s occupational health and safety guidelines and standards<br />

for general work practices, hours of work, air emissions, noise and light;<br />

• Consider investing in local health care facilities, and supporting them in<br />

carrying out ongoing monitoring of the health profile in the area; and<br />

• Conduct a risk assessment for the laying of the gas supply and<br />

transmission line included as part of the Project scope. The Risk<br />

Assessment and the results of which will be incorporated into the EMP<br />

once completed.<br />

During construction there may be also be an increase in sexually transmitted<br />

diseases due to the interaction between immigrant and construction workers<br />

and local women in the area. In addition, there may be a heightened risk of<br />

unwanted pregnancies amongst local women. Mitigation measures for this<br />

shall include a programme raising awareness on general health issues. This<br />

will incorporate an HIV/AIDS awareness and prevention program which will<br />

include voluntary testing, the provision of condoms, and education of the<br />

workforce and local communities. In addition, if the Project considers in<br />

investing in local health care facilities as outlined above, particular focus shall<br />

be paid to sexual and reproductive health.<br />

Strict implementation and ongoing monitoring of the effectiveness of the<br />

mitigation measures for any health related impacts outlined above shall<br />

AZURA EDO IPP<br />

8-25<br />

DRAFT EIA REPORT