This analysis demonstrates that for >89 percent of the year the weather<br />

conditions (all wind directions) are such that significant dust generation is<br />

unlikely. For the remainder of the year (11 percent), any generated dust will<br />

migrate towards north and northeast where this may impact three of the<br />

eastern most receptors in the communities of Orior-Osemwende and the<br />

western most receptor withinthe Ihobvor-Evboeka community (see Figure<br />

7.3). The remainder of the receptors within the community of Ihobvor-<br />

Evboeka are over 1 km from the areas of the site to the south and south west<br />

and are therefore unlikely to be impacted by dust emissions. The community<br />

of Idunmwumowinna-Uhro-Nisen lies to the south of the site and is therefore<br />

unlikely to be impacts by dust generated due to wind direction.<br />

<strong>Impact</strong> Significance<br />

The duration of the construction period is expected to last approximately two<br />

years and thus the dust-generating activities are likely to occur for >12<br />

months. The conditions are unsuitable for dust-generation on site for > 89<br />

percent of the time and although there are only a small number of receptors<br />

(within the Orior-Osemwende and Ihobvor-Evboeka) within 200 m of the<br />

source, these receptors are highly sensitive to these impacts.<br />

The impact of dust on surrounding receptors is therefore considered to be<br />

major prior to mitigation and steps will need to be taken to minimise the<br />

effects.<br />

The emissions arising from traffic associated with the construction activities<br />

on the local receptors are considered likely to be insignificant due to the low<br />

number of vehicles.<br />

7.3.7 <strong>Impact</strong> Description and Significance: Operation<br />

With regard to air quality, there are no specific positive impacts relating to the<br />

operation of the proposed project. The negative air quality impacts predicted<br />

during operation are related to the following:<br />

• Process emissions (NO x and CO);<br />

• Cumulative process emissions (NOx and CO); and<br />

• Greenhouse Gases.<br />

During operations there are unlikely to be any significant emissions of dust or<br />

odour and these have therefore not been assessed. In addition, there will be<br />

relatively few vehicles movements associated with the operation of the<br />

facility, and therefore impacts associated with road traffic have also not been<br />

assessed.<br />

AZURA EDO IPP<br />

7-24<br />

DRAFT EIA REPORT