safety impacts are reduced to minor and the air quality impacts (dust) can be<br />

reduced to minor-moderate with the implementation of the mitigation<br />

measures and monitoring requirements outlined in Chapter8. The impacts of<br />

greenhouse gases during operation are considered to remain significant, as<br />

there are no suitable mitigation measures available to reduce these emissions.<br />

The only other residual negative impact with significance ratings of moderate<br />

is the impact on soils and geology during construction, , however, the severity<br />

of these impacts could be reduced to acceptable levels though the mitigation<br />

identified in the report. The remaining impacts, including noise, water<br />

resources, waste, impacts on demographics and worker considered were<br />

assessed to be of insignificant or low significance after mitigation.<br />

The EIA also identified a number of positive impacts associated with the<br />

proposed development. In particular, the impacts to the national economy<br />

and local employment were also assessed to be of high significance postmitigation.<br />

The positive impacts of the Project on employment and economic<br />

impacts are considered to remain of high significance with enhancement<br />

measures. The positive impact to infrastructure is considered to be moderate<br />

positive during operation, in addition to the training (health and safety) that<br />

will be provided to employees which is assessed to be minor positive.<br />

Although there is a post-mitigation impact as a result of the production of<br />

greenhouses gases which is considered to be significant, the residual positive<br />

impacts on economy and employment are considered to be of high<br />

significance. Based on these considerations and in the context of the severe<br />

electricity supply deficit in Nigeria and the dependency of economic growth<br />

and development on the availability of power, there is a reasonable<br />

justification for the authorisation of the power plant contingent that the<br />

mitigation and enhancement measures described in the EIA and monitoring<br />

for potential environmental and social effects are implemented.<br />

AZURA EDO IPP<br />

XXXIV<br />

DRAFT EIA REPORT