3.6 OPERATION<br />

3.6.1 Maintenance<br />

It is anticipated that all routine maintenance will be conducted by the plant’s<br />

own maintenance team. This will include preventative, corrective and<br />

predictive maintenance in addition to any maintenance or repair required as a<br />

result of emergency breakdowns. In the event that major outages occur it is<br />

anticipated that the services of sub-contractors will be engaged to maximize<br />

economic efficiency. Routine preventative maintenance will be carried out as<br />

part of a Long Term Service Agreement (LTSA) covering the gas turbines, the<br />

gas turbine auxiliary equipment and the gas turbine alternators. Routine<br />

preventative maintenance will be carried out by the operations and<br />

maintenance contractor for the period between inspections.<br />

It has been identified that both the gas turbine Original Equipment<br />

Manufacturers (OEM) and several third party contractors are able to carry out<br />

such long term maintenance on the gas turbines. In addition, the Operations<br />

and Maintenance (O&M) contractor will be required to create preventative<br />

maintenance plans for all of the plant areas, using software to generate work<br />

orders for pieces of machinery and equipment; and all maintenance activities<br />

will be recorded on the preventative maintenance programme.<br />

Inspections are expected to be carried out annually and will be carried out in<br />

the following sequence: two Combustion Inspections (14 days each), a Hot<br />

Gas Path Inspection (25 days), two Combustion Inspections and then a Major<br />

Inspection (60 days). The LTSA will also include emergency repair of<br />

equipment.<br />

Planned Maintenance Events<br />

A typical general schedule for inspections and maintenance outages (planned<br />

maintenance events) for the plant is outlined below in Table 3.5. The duration<br />

of outages depends upon the work schedule as well as the number and types<br />

of personnel assigned.<br />

Table 3.5<br />

Planned Maintenance Events<br />

Maintenance Event Routine Outage Duration<br />

Gas Turbine<br />

Preventative<br />

Maintenance<br />

Inspections<br />

This will be performed annually after offline water<br />

wash. It will assess the overall condition of the gas<br />

turbine with the objectives of reducing unplanned<br />

maintenance, increasing gas turbine availability and,<br />

potentially, to increase the intervals between<br />

Planned Maintenance Events.<br />

Two days<br />

Gas Turbine<br />

Combustion<br />

Inspections<br />

This will be performed at approximately 12,000<br />

Factored Fired Hours for the Gas turbine, or as<br />

modified by the mutual agreement of the Parties.<br />

Six days<br />

AZURA EDO IPP<br />

3-20<br />

DRAFT EIA REPORT