Ref<br />

#<br />

Potential impact<br />

Desired<br />

Outcome<br />

Description of mitigation<br />

Performance<br />

Indicator<br />

Monitoring<br />

Timing/<br />

Frequency<br />

Responsibility Estimated<br />

Cost (USD)<br />

3.2 Noise nuisance<br />

impacts from<br />

general operations<br />

Reduce<br />

noise<br />

nuisance at<br />

receptors<br />

• Air conditioning/air flow requirements shall be designed<br />

to take account of noise breakout;<br />

• Exhaust stacks will be designed to meet a power level of<br />

92 dB(A);<br />

• Design an acoustic enclosure for the gas turbines with a<br />

Hushclad double-skin enclosure with good door seals<br />

which will be replaced regularly to meet the<br />

specifications for 82 dB at 1 m from the source;<br />

• The fitting of a silencer into the exhaust gas system;<br />

• Design gas turbine building (including air conditioning,<br />

walls, roof, windows and doors) to have a high noise<br />

reduction rating and ensure that there are no significant<br />

gaps;<br />

• Configure plant layout and orientation to minimise noise;<br />

• Use acoustic enclosure/ absorption materials in internal<br />

walls;<br />

• In cases where noise levels cannot be reduced below<br />

guideline levels, the Project will investigate the relocation<br />

of these households;<br />

• Implementing design measures such as attenuators on<br />

the stacks, cladding on the turbine building and/ or noise<br />

barriers to reduce noise level requirements of 45dBA for<br />

the four identified receptors; and<br />

• Establish a grievance mechanism.<br />

Noise levels<br />

below <strong>IFC</strong><br />

limits<br />

Noise<br />

monitoring.<br />

Details to be<br />

agreed with<br />

FMEnv prior<br />

to operation.<br />

Monthly<br />

HSE<br />

Coordinator,<br />

<strong>Azura</strong> <strong>Power</strong><br />

with<br />

subcontractors<br />

if necessary<br />

Cost<br />

associated<br />

with monthly<br />

noise<br />

monitoring<br />

(approx 500<br />

USD)<br />

No other<br />

costs<br />

assuming<br />

that further<br />

noise<br />

reduction<br />

controls are<br />

not needed<br />

3.3 Terrestrial Soils<br />

and Geology<br />

including:<br />

• Increased runoff<br />

and potential<br />

erosion<br />

• Potential<br />

contamination<br />

from spills<br />

Minimise<br />

soil loss,<br />

reduce<br />

erosion and<br />

decrease,<br />

risk of<br />

siltation of<br />

water<br />

resources<br />

and risk of<br />

contaminati<br />

on<br />

• No open ground left unpaved or rehabilitated and<br />

revegetated.<br />

• To the extent possible covering large areas of the site with<br />

gravel (or similar material) to allow for greater<br />

permeability particularly during heavy rains.<br />

• Development and implementation of a waste<br />

management plan.<br />

• Effective operation of the wastewater treatment plant.<br />

• Effluent flowing offsite to comply with FMEnv<br />

requirements for disposal of effluent offsite.<br />

Visual<br />

inspection<br />

Visual<br />

inspection<br />

and<br />

photographic<br />

record<br />

Daily<br />

HSE<br />

Coordinator,<br />

<strong>Azura</strong> <strong>Power</strong><br />

Part of HSE<br />

Coordinator’<br />

s duties