10.4.4 Auditing<br />

construction, installation, operations and decommissioning stages of the<br />

proposed Project.<br />

Beyond the routine inspection and monitoring activities conducted, audits<br />

will be carried out internally by <strong>Azura</strong> <strong>Power</strong> to ensure compliance with<br />

regulatory requirements as well as their own EHS standards and policies.<br />

Audits to be conducted will also cover the subcontractor self-reported<br />

monitoring and inspection activities. The audit shall be performed by<br />

qualified staff and the results shall be reported to <strong>Azura</strong> <strong>Power</strong> to be<br />

addressed.<br />

The audit will include a review of compliance with the requirements of the<br />

EIA and ESMP and include, at a minimum, the following:<br />

• completeness of EHS documentation, including planning documents and<br />

inspection records;<br />

• conformance with monitoring requirements;<br />

• efficacy of activities to address any non-conformance with monitoring<br />

requirements; and<br />

• training activities and record keeping.<br />

There will be a cycle of audits into specific areas of the Project such as waste<br />

management. The frequency of audits will be risk based and will vary with<br />

the stage of the Project and will depend on the results of previous audits.<br />

10.4.5 Corrective Action<br />

10.4.6 Reporting<br />

Investigating a ‘near miss’ or actual incident after it occurs can be used to<br />

obtain valuable lessons and information that can be used to prevent similar or<br />

more serious occurrences in the future.<br />

<strong>Azura</strong> <strong>Power</strong> will implement a formal non compliance and corrective action<br />

tracking procedure for investigating the causes of, and identifying corrective<br />

actions to, accidents or environmental or social non-compliances. This will<br />

ensure coordinated action between <strong>Azura</strong> <strong>Power</strong> and its subcontractors. The<br />

EHS coordinator will be responsible for keeping records of corrective actions<br />

and for overseeing the modification of environmental or social protection<br />

procedures and/or training programs to avoid repetition of nonconformances<br />

and non-compliances.<br />

Throughout the Project, <strong>Azura</strong> <strong>Power</strong> will keep the regulatory authorities<br />

informed of the Project performance with respect to EHS matters by way of<br />

written status reports and face-to-face meetings. <strong>Azura</strong> <strong>Power</strong> will prepare a<br />

report on environmental and social performance and submit it to FMEnv. The<br />

AZURA EDO IPP<br />

10-10<br />

DRAFT EIA REPORT