Emissions of Greenhouse Gases<br />

The proposed facility will contribute to greenhouses gases through the<br />

emission of fossil fuel derived carbon dioxide (CO 2) to the atmosphere. The<br />

main source of CO 2 emissions during operation is the combustion of natural<br />

gas to generate power. GHG emissions from the proposed facility, as<br />

provided by <strong>Azura</strong> <strong>Power</strong>, is calculated to be a total CO 2 emissions of 2,718<br />

kt/yr.<br />

This value exceeds the <strong>IFC</strong> Performance Standard 3 for Pollution Prevention and<br />

Abatement threshold for a single project/ development of 100 kilo tonnes CO 2-<br />

equivalents per year for a single project or development, and is therefore<br />

considered a significant negative impact.<br />

7.3.8 <strong>Impact</strong> Description and Significance: Decommissioning<br />

<strong>Impact</strong> Description<br />

With regard to air quality, there are no specific positive impacts relating to the<br />

decommissioning of the proposed project. The negative impacts identified<br />

during decommissioning activities are due to emissions of dust resulting from<br />

demolition of buildings, site levelling and filling activities at the site. There<br />

may also be some emissions due to traffic associated with decommissioning.<br />

This analysis demonstrates that for >89 percent of the year the weather<br />

conditions (all wind directions) are such that significant dust generation is<br />

unlikely. For the remainder of the year (11 percent), any generated dust will<br />

migrate towards north and northeast where this may impact three of the<br />

eastern most receptors in the communities of Orior-Osemwende and the<br />

western most receptor within the Ihobvor-Evboeka community (see Figure<br />

7.3). The remainder of the receptors within the community of Ihobvor-<br />

Evboeka are over 1 km from the areas of the site to the south and south west<br />

and are therefore unlikely to be impacted by dust emissions. The community<br />

of Idunmwumowinna-Uhro-Nisen lies to the south of the site and is therefore<br />

unlikely to be impacts by dust generated due to wind direction.<br />

<strong>Impact</strong> Significance<br />

The duration of the decommissioning period is expected to be less than a year<br />

(ie