22.01.2014 Views

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

frequency of this reporting will be agreed upon between <strong>Azura</strong> <strong>Power</strong> and<br />

FMEnv.<br />

If required, <strong>Azura</strong> <strong>Power</strong> will provide appropriate documentation of EHS<br />

related activities, including internal inspection records, training records, and<br />

reports to the relevant authorities. Subcontractors are also required to provide<br />

EHS performance reporting to <strong>Azura</strong> <strong>Power</strong> on a regular basis through<br />

weekly and monthly reports. These will be used as inputs to the above.<br />

AZURA EDO IPP<br />

10-11<br />

DRAFT EIA REPORT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!