• Bitumen shall not be overheated and where possible, bitumen shall not be<br />

heated with open flame burners; and<br />

8.1.2 Operation<br />

• Pots and tanks containing hot bitumen shall be covered to minimise fume<br />

production.<br />

With the strict implementation of the mitigation measures listed above, the<br />

magnitude of the dust impact will be reduced such that the residual<br />

significance is considered to be minor-moderate.<br />

The turbines will use a dry low NOx combustion system which will form a<br />

key mitigation measure during the Operation phase. In addition all vehicles<br />

used shall be regularly maintained.<br />

The impact significance air emissions during operation will remain minor<br />

(NO 2) and insignificant (CO) and significant (greenhouse gases).<br />

8.1.3 Decommissioning<br />

Whilst there are no significant impacts identified associated with the<br />

decommissioning phase of the Project, it is recommended that best practice<br />

measures are implemented to minimise the potential for dust to be generated<br />

and escape off-site. These mitigation measures shall be developed as part of<br />

the decommissioning plan and shall be broadly similar to those identified<br />

during construction and the remainder of the above section describing<br />

management of dust impacts during construction. For example also, sulphur<br />

hexafluoride, a greenhouse gas, from the transformers should not be released<br />

to the atmosphere, but be reclaimed for reuse, if possible.<br />

On the basis of the potential impacts identified for the decommissioning<br />

phase, a dust mitigation programme shall be developed in the Site Closure<br />

and Restoration Plan.<br />

The implementation of mitigation measures will reduce the dust produced as<br />

part of the decommissioning activities and prevent the dust from leaving the<br />

site. The residual impacts during decommissioning are likely to be minormoderate<br />

after the implementation of mitigation.<br />

8.2 NOISE<br />

8.2.1 Construction<br />

The construction contractor shall implement the recommendations set out in<br />

the British Standard 5228: 2009 or similar standards as well as the <strong>IFC</strong><br />

Guideline Noise Levels. The following general noise control strategies shall<br />

be adopted and enforced where practicable:<br />

AZURA EDO IPP<br />

8-2<br />

DRAFT EIA REPORT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!