• All waste shall be disposed of in line with Nigerian requirements at a<br />

suitable and licensed waste disposal facility. ;<br />

• <strong>Azura</strong> <strong>Power</strong> shall identify a suitable disposal site at Port Harcourt which<br />

meets the required capacity for the disposal of general and hazardous<br />

wastes prior to decommissioning;<br />

• Waste shall be separated on site and waste storage areas shall be located<br />

on hardstanding to prevent potential contamination; and<br />

• All metal shall be sold for scrap and machinery; and infrastructure and<br />

buildings shall be dismantled such that as much of this waste can be<br />

reused or recycled.<br />

With the implementation of the mitigation measures during operation, the<br />

residual impact magnitude will be reduced to low and the significance of the<br />

residual impact on biodiversity will be minor.<br />

8.7 PHYSICAL RESETTLEMENT<br />

As noted earlier, an international standard RAP is being developed for the<br />

Project resettlement. The relevant mitigation measures will be outlined in the<br />

RAP but encompass the following:<br />

• Accurately define entitlement;<br />

• Fair compensation;<br />

• Livelihood restoration; and<br />

• The movement of community structures.<br />

Resettlement will disrupt the lives of the resettled communities and significant<br />

support will be required to ensure that the affected communities are able to reestablish<br />

their communal resources, homes and other assets lost through the<br />

process, as well as to re-establish their livelihood.<br />

The proposed mitigation and management measures are intended to facilitate<br />

adjustment to the impacts of resettlement; however, such management<br />

measures will not prevent resettlement and associated loss of communal<br />

facilities and cultural heritage from occurring.<br />

The negative residual impact is reduced to a moderate significance rating<br />

following the implementation of the Entitlement Framework and<br />

compensation measures defined in the RAP, as these will support affected<br />

households in the re-establishment of their livelihoods to match or exceed preresettlement<br />

standards.<br />