22.01.2014 Views

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Ref<br />

#<br />

Potential<br />

impact<br />

1.5 Anticipated<br />

impacts on<br />

biodiversity<br />

Desired<br />

Outcome<br />

Ensure the<br />

protection and<br />

preservation of<br />

endangered<br />

and vulnerable<br />

faunal and<br />

floral species<br />

1.6 Noise impacts Ensure that<br />

cumulative<br />

noise impacts<br />

are minimised<br />

Description of mitigation<br />

• Site design to consider retaining as many floral species as<br />

possible, and the relocation of those that cannot be<br />

retained and protected; and<br />

• Mark and protect any Threatened floral species on site.<br />

• Undertake further modeling and design refinement to<br />

confirm cumulative noise impact results prior to<br />

operation and construct noise barriers at four farms on<br />

the western boundary of the site (see Chapter 9) if<br />

required. Submit results to FMENv;<br />

• Establish grievance mechanism for local community<br />

members to register complaints;<br />

Performance<br />

Indicator<br />

Biodiversity<br />

Management<br />

Plan (BMP)<br />

including a<br />

record of the<br />

abundance<br />

and<br />

distribution<br />

of threatened<br />

floral and<br />

faunal<br />

species<br />

Modeling<br />

results<br />

Documented<br />

grievance<br />

mechanism<br />

document<br />

Monitoring<br />

Ensure that<br />

the measures<br />

identified in<br />

the BMP are<br />

implemented<br />

Confirmation<br />

of<br />

requirement<br />

for barrier to<br />

reduce noise<br />

at the four<br />

farms<br />

Timing/<br />

Frequency<br />

Prior to<br />

contructio<br />

n<br />

During<br />

detailed<br />

design<br />

Responsibilit<br />

y<br />

<strong>Azura</strong> <strong>Power</strong><br />

<strong>Azura</strong> <strong>Power</strong><br />

Estimated<br />

Costs USD)<br />

Approximate<br />

ly 10,000<br />

USD<br />

Approximate<br />

15,000 USD

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!