22.01.2014 Views

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Ref<br />

#<br />

Potential<br />

impact<br />

Desired<br />

Outcome<br />

Description of mitigation<br />

Performance<br />

Indicator<br />

Monitoring<br />

Timing/<br />

Frequency<br />

Responsibilit<br />

y<br />

Estimated<br />

Costs USD)<br />

1.3 Key economic<br />

resettlement<br />

impacts include:<br />

• Loss of ongoing<br />

income;<br />

• Loss of initial<br />

investment<br />

for<br />

establishing<br />

crops;<br />

• Inability to<br />

repay loans;<br />

• Reduced<br />

income and<br />

economic<br />

activity;<br />

• Increased<br />

food<br />

insecurity;<br />

and<br />

• Increased<br />

tensions<br />

between<br />

stakeholders<br />

and the<br />

government.<br />

Minimise<br />

impacts on<br />

employment<br />

legacy issues<br />

associated with<br />

the change in<br />

land use.<br />

• Implementation of a RAP to WB/ <strong>IFC</strong> standards.<br />

Adherence to<br />

the <strong>IFC</strong><br />

Performance<br />

Standards<br />

The RAP will<br />

set out<br />

monitoring<br />

requirements<br />

Grievance<br />

mechanism<br />

records<br />

Preconstructi<br />

on phase<br />

and<br />

monitorin<br />

g<br />

throughou<br />

t the<br />

Project<br />

<strong>Azura</strong> <strong>Power</strong><br />

To be<br />

determined<br />

based on the<br />

outcome of<br />

RAP<br />

1.4 Anticipated<br />

impacts on local<br />

culture<br />

resources<br />

Ensure good<br />

communicatio<br />

n between<br />

<strong>Azura</strong> and<br />

local<br />

communities<br />

• Appoint CLO to liaise with the local communities.<br />

• Implementation of the Physical Cultural Resources<br />

Management Plan; and<br />

• Establish a Grievance Mechanism.<br />

Grievance<br />

mechanism<br />

records<br />

Ensure that<br />

grievance<br />

mechanism is<br />

in place<br />

Prior to<br />

contructio<br />

n<br />

EHS<br />

Cordinator<br />

Salary cost<br />

for CLO<br />

(approximate<br />

ly 15,000<br />

USD per<br />

annum)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!