8.6.2 Operation<br />

• Waste shall be separated on site and waste storage areas shall be located<br />

on hardstanding to prevent potential contamination.<br />

With the implementation of the mitigation measures during construction, the<br />

residual impact magnitude will be reduced to low and the significance of the<br />

residual impact on biodiversity will be minor.<br />

The following mitigation measures shall be implemented during operation:<br />

• The Operator shall develop a waste management plan which will include<br />

requirements for separation, handling and disposal of all wastes<br />

generated. <strong>Azura</strong> <strong>Power</strong> will ensure that a waste management plan is<br />

development across all the phases of the Project;<br />

• All waste shall be disposed of in line with Nigerian requirements at a<br />

suitable and licensed waste disposal facility. It is envisaged that the Project<br />

will use the services of a facility located in Port Harcourt;<br />

• <strong>Azura</strong> <strong>Power</strong> shall identify suitable disposal sites and confirm capacities<br />

for disposal for general and hazardous wastes prior to the operational<br />

phase;<br />

• Waste shall be separated on site and waste storage areas shall be located<br />

on hardstanding (or bunded, if suitable) to prevent potential<br />

contamination;<br />

• Spent oils (including transformer oil) shall be recycled; and<br />

• <strong>Azura</strong> <strong>Power</strong> shall undertake regular monitoring of wastewater<br />

discharged offsite including the by product of sludge from waste water<br />

treatment.<br />

With the implementation of the mitigation measures during the operational<br />

phase, the residual impact magnitude will be reduced to low and the<br />

significance of the residual impact on biodiversity will be insignificant -<br />

minor.<br />

8.6.3 Decommissioning<br />

The following mitigation measures shall be implemented during the<br />

construction phase:<br />

• The EPC contractor shall develop a waste management plan which will<br />

include requirements for separation, handling and disposal of all wastes<br />

generated. This will form part of a Site Closure and Restoration Plan to be<br />

developed;<br />