• Oil interceptors and silt traps shall be put in place to manage and retain<br />

sediments on site;<br />

• Avoid erosion by ensuring that all roads used on and off site are suitable<br />

for heavy vehicles (during construction and operation);<br />

• As far as possible implement low impact excavation, in-fill and trenching<br />

methods;<br />

• The amount of bare ground and stockpiles shall also be minimised to<br />

avoid silt runoff;<br />

• Rehabilitation and revegetation of cleared areas adjacent to the Project site<br />

which shall include the re-vegetation of bare soils before the next wet<br />

season;<br />

• Bunding of areas where hazardous substances are stored (eg fuel, waste<br />

areas);<br />

8.3.2 Operation<br />

• Development and implementation of a waste management plan (as part of<br />

the ESMP) to ensure that waste is disposed of correctly such that soil<br />

contamination is minimised.<br />

With the implementation of the mitigation measures listed above and<br />

decreased erosion potential, the impact magnitude will be reduced to<br />

moderate. The receptor sensitivity remains low, and therefore the residual<br />

impact will remain moderate.<br />

During operation it is important that effective site drainage and silt retention<br />

methods have been implemented by the time the Project has reached the<br />

operational phase. The following mitigation measures shall also be in place<br />

during the operation phase:<br />

• Paving of the area occupied by the plant and roads on site, which will<br />

cover approximately 25 percent of the total area of the site ;<br />

• The majority of the surface of the site area will be covered with gravel or a<br />

similar material with a higher permeable surface to reduce surface run-off<br />

particularly during heavy rains;<br />

• Development and implementation of a waste management plan (as part of<br />

the ESMP) to ensure that waste is disposed of correctly such that soil<br />

contamination is minimised; and<br />

• Effective operation of the wastewater treatment plant to ensure that waste<br />

water and oil contaminated waste water are in compliance with relevant<br />

standards after treatment to avoid soil contamination.<br />

AZURA EDO IPP<br />

8-6<br />

DRAFT EIA REPORT