Ref<br />

#<br />

Potential impact<br />

3.4 Water Resource<br />

impacts:<br />

• Potential<br />

contamination<br />

from accidental<br />

spills and<br />

increased<br />

erosion and<br />

runoff<br />

• Water use<br />

Desired<br />

Outcome<br />

Prevent<br />

contaminati<br />

on of water<br />

resources<br />

Description of mitigation<br />

• Ensure location of storage areas for hazardous substances<br />

on hardstanding (or bunded, if suitable) to prevent<br />

potential contamination, including areas around gauges,<br />

pumps, sumps and loading /unloading areas;<br />

• Diesel storage tanks and components to meet<br />

international standards for structural design and<br />

integrity;<br />

• Provide cathodic protection inside steel tanks and piping,<br />

if required.<br />

• Periodic inspection for corrosion and integrity of storage<br />

tanks, pipes and components and regular maintenance<br />

pipes, seals, connectors and valves and other<br />

components.<br />

• All tanks to be equipped with alarms, automatic shut-off<br />

devices and catch basins.<br />

• Construct stormwater channels and oilwater separators<br />

in diesel storage, handling and transfer areas.<br />

• Develop Spill Control and Response plans.<br />

• Monthly monitoring programme of effluent released<br />

from the site.<br />

• Monthly groundwater monitoring, especially for<br />

hydrocarbon leaks.<br />

Performance<br />

Indicator<br />

Effluent<br />

quality<br />

meeting<br />

Nigerian,<br />

WHO and<br />

World Bank<br />

requirements<br />

Monitoring<br />

Water quality<br />

monitoring<br />

before<br />

effluent<br />

leaves the<br />

site<br />

Timing/<br />

Frequency<br />

Monthly<br />

Responsibility Estimated<br />

Cost (USD)<br />

HSE<br />

Coordinator,<br />

<strong>Azura</strong> <strong>Power</strong><br />

Cost for<br />

sampling and<br />

analysis of<br />

liquid<br />

effluent and<br />

receiving<br />

water bodies<br />

(approx 1,000<br />

USD for setup<br />

and 5,000<br />

USD for each<br />

monitoring<br />

event)