22.01.2014 Views

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Ref<br />

#<br />

Potential impact<br />

Desired<br />

Outcome<br />

Description of mitigation<br />

Performance<br />

Indicator<br />

Monitoring<br />

Timing/<br />

Frequency<br />

Responsibility Estimated<br />

Cost (USD)<br />

3.7 Operational<br />

impacts to<br />

demographic<br />

profile include:<br />

• Reversal of<br />

youth<br />

outmigration<br />

trends;<br />

• Population<br />

increase due to<br />

influx;<br />

• Change to the<br />

ethnic structure<br />

due to influx.<br />

Minimise<br />

impacts of a<br />

worker<br />

influx and<br />

increased<br />

population<br />

on<br />

community<br />

demographi<br />

cs<br />

• Camp and workforce management protocols;<br />

• Transparent recruitment process;<br />

• Local employment where possible; and<br />

• Establish a grievance mechanism for communities.<br />

Adherence to<br />

the <strong>IFC</strong><br />

Performance<br />

Standards<br />

The Local<br />

Employment<br />

and Local<br />

Procurement<br />

Policies will<br />

and Influx<br />

Management<br />

Plan will<br />

outline<br />

monitoring<br />

requirements<br />

Througho<br />

ut<br />

operation<br />

The Local<br />

Employment<br />

and Local<br />

Procurement<br />

Policy in<br />

addition to the<br />

Influx<br />

Management<br />

Plan will<br />

define the<br />

responsibility.<br />

<strong>Azura</strong> <strong>Power</strong><br />

would be<br />

responsible for<br />

preparing the<br />

plan.<br />

Part of HSE<br />

Coordinator’<br />

s duties<br />

3.8 <strong>Impact</strong>s to cultural<br />

institutions during<br />

operations include:<br />

• Ongoing<br />

disruption of<br />

traditional<br />

religious<br />

observance due<br />

to with<br />

removal/<br />

relocation of<br />

sacred sites; and<br />

• Influx affecting<br />

the ethnic<br />

structure and<br />

associated<br />

customs, rites,<br />

language, etc.<br />

Minimise<br />

impacts of a<br />

new<br />

workforce<br />

on existing<br />

community<br />

traditions<br />

and<br />

customs<br />

• Camp and workforce management protocols;<br />

• Ensure that traditional leaders are formally involved in<br />

the Project operations;<br />

• Implementation of the Physical Cultural Resources<br />

Management Plan;<br />

• Maintain a grievance mechanism;<br />

• Carry out the RAP and implement proposed mitigation<br />

measures.<br />

Adherence to<br />

the <strong>IFC</strong><br />

Performance<br />

Standards<br />

RAP will<br />

outline<br />

monitoring<br />

requirements<br />

Religious<br />

Chiefs and<br />

traditional<br />

leader should<br />

be involved<br />

into<br />

monitoring.<br />

The Physical<br />

Cultural<br />

Resources<br />

Management<br />

Plan<br />

Througho<br />

ut<br />

operation<br />

RAP will<br />

define the<br />

responsibility.<br />

Part of<br />

normal<br />

operations

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!