<strong>Impact</strong> <strong>Impact</strong> Description Phase Pre-mitigation<br />

Significance<br />

Decommissioning Insignificant<br />

Negative<br />

Soils and<br />

Geology<br />

Removal of soils during site clearance and<br />

potential for contamination through spills<br />

and incidents.<br />

Increased soil erosion and surface run-off<br />

particularly during heavy rains due to soil<br />

disturbance.<br />

Construction<br />

Moderate<br />

Negative<br />

Summary of Mitigation and Enhancement Measures<br />

• Develop detailed noise control plan, use temporary noise<br />

barriers and use ‘low noise’ equipment (including alternative<br />

reversing alarms), where possible;<br />

• Staff training;<br />

• Ensure periods of respite are provided in the case of<br />

unavoidable maximum noise level events;<br />

• Avoid dropping from heights and metal-to-metal contact;<br />

• Avoid clustering of mobile plant near receptors and enforce rest<br />

periods for unavoidable maximum noise events;<br />

• Select ‘low noise’ equipment, or methods of work;<br />

• Use most effective mufflers, enclosures and low-noise tool bits<br />

and blades;<br />

• Investigate use of alternatives to audible reversing alarms (such<br />

as broadband noise emitting models) or configure to maximise<br />

forward movements of mobile plant;<br />

• Use alternatives to diesel/petrol engines and pneumatic units,<br />

such as hydraulic or electric-controlled units, where feasible and<br />

reasonable;<br />

• Use temporary noise barriers for small equipment, where<br />

required;<br />

• Reduce throttle settings and turn off equipment and plant when<br />

not used;<br />

• Appoint Community Liaison Officer (CLO) and inform<br />

potentially impacted residents of potential noise; and<br />

• Regular inspection and maintenance of all plant and equipment.<br />

• Develop and implement of a waste management plan;<br />

• Low impact excavation, in-fill and trenching methods,<br />

minimise bare ground and stockpiles and rehabilitate cleared<br />

areas before wet season;<br />

• Effective site drainage using cut-off drains, temporary drainage<br />

channels;<br />

• Use oil/ water separators and silt traps;<br />

• Bund hazardous substances storage areas;<br />

Residual<br />

Significance<br />

Insignificant<br />

Negative<br />

Moderate<br />

Negative<br />

XXII