during decommissioning is expected to be unlikely. The overall magnitude is<br />

therefore considered to be low.<br />

Natural changes to cultural practices and institutions are to be expected over<br />

any significant period of time, and associated with general development; and<br />

the sensitivity of the receptor is therefore considered to be insignificant - low.<br />

Assuming effective management of Project-related impacts over the Project<br />

life-cycle, impacts to cultural institutions associated with decommissioning are<br />

expected to be insignificant.<br />

7.12.4 <strong>Impact</strong> Description and Significance: Summary<br />

Table 7.24 provides a summary of the significant impacts likely to arise during<br />

construction, operation and decommissioning prior to the implementation of<br />

mitigation measures (see Chapter 8).<br />

Table 7.24<br />

Summary of <strong>Impact</strong> Significance Pre-mitigation<br />

Phase <strong>Impact</strong> Significance (premitigation)<br />

Construction Disruption of local customs, change in<br />

traditional leadership structures and removal<br />

of sacred sites.<br />

Moderate Negative<br />

Operation<br />

Ongoing disruption of local customs and<br />

impacts related to removal of sacred sites as<br />

well as change in ethnic structure and<br />

customs.<br />

Minor Negative<br />

Decommissioning Ongoing disruption of local customs and<br />

impacts related to removal of sacred sites,<br />

unresolved resettlement issues, loss of sense<br />

of authority and change in ethnic structure<br />

and customs.<br />

Insignificant Negative<br />

7.13 IMPACTS TO EMPLOYMENT AND ECONOMY<br />

7.13.1 <strong>Impact</strong> Description and Significance: Construction<br />

<strong>Impact</strong> Description<br />

The proposed Project is a staged development involving a construction phase<br />

of 24 to 36 months. The Project is expected to require a direct workforce of<br />

approximately 500 during this phase; this workforce will be primarily<br />

recruited via contractors and will include both skilled and unskilled roles,<br />

most of which will be temporary.<br />

AZURA EDO IPP<br />

7-64<br />

DRAFT EIA REPORT