Table 1.1<br />

The EIA Team<br />

Name Organisation Role Qualifications and<br />

Experience<br />

EIA PROJECT MANAGEMENT TEAM<br />

Henry Camp ERM SA EIA Project Director BA, 27 years<br />

Karen Opitz ERM SA EIA Project Manager BSc, M(Phil) (Env Mgt),<br />

6 years<br />

Nomsa Fulbrook- ERM SA Project Consultant MSc, 2 yrs<br />

Bhembe<br />

EIA SPECIALISTS<br />

Tunde Morakinyo ERM UK Social and health BSc (Eng), 14 years<br />

Bhavin Vyas ERM UK Social, health and Bsc(Eng), MA, 8 years<br />

resettlement<br />

Ibrahim Salau EnvAccord EnvAccord<br />

B.Eng, 12 years<br />

<strong>Environmental</strong> Lead<br />

Prof J Olawoye Univ. of Ibadan Social and health PhD, 32 years<br />

Dr JO Oladeji Univ. of Ibadan Social and health PhD, 12 years<br />

Dr OB Oyesola Univ. of Ibadan Social and health PhD, 12 years<br />

SPECIAL TOPIC EXPERTS<br />

Rod Linnett ERM UK Noise Dipl(Eng), 20 years<br />

Dr Chris Hazell- ERM UK Air Emissions PhD, 13 years<br />

Marshall<br />

Hanco Roux ERM Groundwater BTech(Geology), 15<br />

years<br />

1.3.3 Scope of the EIA<br />

EIAs include environmental, social, and consultation elements which are<br />

integrated into the planning and decision-making process to avoid, reduce, or<br />

mitigate adverse impacts and to maximise the benefits of a proposed project.<br />

The emphasis of the EIA is to produce robust environmental and social<br />

management plans (EMPs) which are able to effectively implement the<br />

recommended mitigation measures identified in the EIA, during the life of the<br />

Project and at the time of project decommissioning.<br />

The overall EIA process is shown schematically in Figure 1.3 and the following<br />

key steps are described in the subsequent sections.<br />

• Screening and scoping<br />

• Baseline data collection<br />

• Stakeholder consultation<br />

• <strong>Impact</strong> assessment<br />

• Management plans<br />

• Reporting and disclosure<br />

Screening and Scoping<br />

One of the main objectives of scoping is to identify the potentially significant<br />

environmental issues relating to the implementation, operation and<br />

decommissioning of the proposed Project that should be addressed as part of<br />

the EIA. This enables the developer to address the key issues from the outset,<br />

AZURA EDO IPP<br />

1-5<br />

DRAFT EIA REPORT

Hooray! Your file is uploaded and ready to be published.