<strong>Impact</strong> <strong>Impact</strong> Description Phase Pre-mitigation<br />

Significance<br />

Pressure on or development of<br />

infrastructure increased waste,<br />

contamination of water resources, traffic<br />

disruption and increased power supply.<br />

Increased local power supply in addition<br />

to the national power grid.<br />

Operation<br />

Summary of Mitigation and Enhancement Measures<br />

Major Positive • Community Investment Plan outlining local distribution of<br />

electricity;<br />

• Investments to upgrade services; and<br />

• Regular water monitoring in local communities.<br />

Residual<br />

Significance<br />

Major Positive<br />

Reduced power to the national grid, local<br />

power supply loess and decline in<br />

infrastructure maintenance and local<br />

authority investment<br />

Decommissioning<br />

Minor<br />

Negative<br />

• Implement Influx Management Plan;<br />

• SME development, support and annual training;<br />

• Invest in infrastructure development; and<br />

• Staff training.<br />

Insignificant<br />

Negative<br />

Health<br />

<strong>Impact</strong>s<br />

Workplace<br />

Health and<br />

Community health and safety impacts as a<br />

result of traffic, contamination risks as<br />

well as air and noise impacts, and<br />

potential safety risks due to the<br />

transmission line and gas pipeline spur<br />

Improved access to health care facilities for<br />

the local communities<br />

Ongoing effects from the operational<br />

phase, safety risks and noise and dust<br />

nuisance<br />

Construction<br />

Moderate<br />

Negative<br />

• Local Employment Strategy, Traffic Management Plan (after<br />

Traffic study to input into this plan) and camp and workforce<br />

Minor<br />

Negative<br />

Operation<br />

Minor<br />

management protocols;<br />

Minor<br />

Negative • Health awareness programme incorporating an HIV/AIDS Negative<br />

awareness and prevention program which will include<br />

voluntary testing, the provision of condoms, and education of<br />

Construction Minor Positive local communities;<br />

Minor Positive<br />

• Communication of Project transport plans;<br />

Operation<br />

Minor Positive • Establish a Grievance Mechanism.<br />

Minor Positive<br />

• Establish parameters around use of security forces;<br />

• Approve contractor HSE plans prior to contract award;<br />

• All contractors comply with <strong>Azura</strong> <strong>Power</strong>’s occupational health<br />

and safety guidelines and standards;<br />

• Fire and explosion risk management including routine safety<br />

checks, training, first aid boxes, emergency spill prevention<br />

plans;<br />

• Risk Assessment identifying key safety risks of the transmission<br />

line and gas pipeline spur which will inform the EMP;<br />

• Community safety awareness campaigns; and<br />

• Consider investing in local health care facilities.<br />

Decommissioning<br />

Moderate<br />

Negative<br />

Physical health impacts due to increased Construction Major<br />

Negative<br />

• Establish contingency fund to address potential contamination;<br />

• Provide treatment to victims of H&S impacts after closure; and<br />

• Consider investing in local health care facilities.<br />

• Encourage testing (<strong>Azura</strong> <strong>Power</strong> and contractors) for sexually<br />

Insignificant-<br />

Minor<br />

Negative<br />

Minor<br />

Negative<br />

XXVIII