22.01.2014 Views

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Job title<br />

Level of<br />

Skill<br />

Semiskilled/<br />

unskilled<br />

Description<br />

Number of<br />

Positions<br />

5<br />

General Helpers<br />

Assistants to fitter and electricians (as<br />

required) and cleaners.<br />

Warehouse<br />

Keeper/ Driver<br />

Semiskilled<br />

Keeping and maintaining the warehouse and<br />

issuing parts and consumables.<br />

1<br />

Drivers<br />

Semiskilled<br />

Driving on-site. 3<br />

Control room<br />

operators<br />

Skilled<br />

Monitor the operation of the Facility from the<br />

control room and support the general<br />

operators in their duties.<br />

10<br />

(one per<br />

shift, plus<br />

one on<br />

standby)<br />

General operators<br />

or watchkeepers<br />

Semiskilled<br />

General operation and plant monitoring<br />

duties.<br />

10<br />

(on rotating<br />

shifts)<br />

In addition, up to 40 ancillary and contract workers will be employed during<br />

the operation phase of the power plant and this will include security, cleaning<br />

and gardening staff.<br />

<strong>Azura</strong> <strong>Power</strong> will seek to promote the development of local skills and the<br />

transfer of international technologies and expertise to local manpower and<br />

local manufacturers. It will also ensure that activities are fully compliant with<br />

the relevant (and evolving) “local content” provisions of Nigerian law and<br />

regulation.<br />

Furthermore, the selection of sub-contractors by <strong>Azura</strong> <strong>Power</strong> will ensure that<br />

only high quality sub-contractors (whether of local, national or international<br />

provenance) are selected. They will be required to adopt <strong>Azura</strong> <strong>Power</strong>’s<br />

policies on community liaison and local workforce employment. Based on its<br />

analysis of other projects, <strong>Azura</strong> <strong>Power</strong> believes that this approach will have a<br />

more direct and positive impact on the local community workforce and will<br />

lead to a greater degree of skills transfer.<br />

Permanent staff<br />

The operating company does not currently have any permanent employees in<br />

Nigeria. Upon employment of local labour, <strong>Azura</strong> <strong>Power</strong> will comply with all<br />

relevant Nigerian employment laws and practices including those<br />

requirements related to retrenchment policies, dismissal procedures,<br />

discipline procedures and grievances. The majority of staff based in Nigeria<br />

will be hired locally through job adverts and interviews.<br />

AZURA EDO IPP<br />

3-23<br />

DRAFT EIA REPORT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!