enefit the local communities. These programmes will be aimed primarily at<br />

improving the health and education of the inhabitants of these communities.<br />

7.14.1 <strong>Impact</strong> Description and Significance: Construction<br />

<strong>Impact</strong> Description<br />

The main negative impacts to infrastructure associated with the construction<br />

phase will be associated with the influx of opportunistic job seekers and the<br />

resulting pressure on already inadequate social amenities. These include:<br />

• Influx of opportunistic job seekers into the communities, adding pressure<br />

onto already overburdened infrastructure services (roads, schools, health<br />

facilities, etc);<br />

• Increased household waste and the inability to dispose of this in a safe and<br />

healthy manner;<br />

• Contamination of water resources used by local communities; and<br />

• Disruption to road access from Project vehicles.<br />

The main positive impacts to infrastructure associated with the construction<br />

phase will be the construction, reinforcement and paving of roads and the<br />

expenditures made by the developers on local community projects (eg<br />

assistance in borehole construction and health and education projects).<br />

<strong>Impact</strong> Significance<br />

The extent of these impacts will be mainly local as the impact will be<br />

experienced in the three communities only. The duration of the negative<br />

impacts is restricted to the period of the construction phase but the duration of<br />

the positive impacts is likely to subsist beyond the construction phase. Since<br />

the Project plans around infrastructure use are yet to be fully developed, the<br />

probability of impacts occurring is cautiously given as likely. The overall<br />

magnitude of the impact is therefore low.<br />

The sensitivity of the receptors is considered to be moderate as there is little<br />

existing infrastructure.<br />

It is also important to note the possible benefit to local education associated<br />

with Project training opportunities. At this point, however, there is<br />

insufficient information about how the Project proposes to provide training,<br />

nor to what extent this will benefit local stakeholders. Thus the significance<br />

rating of this neutral (negative and positive aspects) impact is assessed to be<br />

minor prior to mitigation.<br />

7.14.2 <strong>Impact</strong> Description and Significance: Operation<br />

<strong>Impact</strong> Description<br />

Key concerns during the operational phase include:<br />

AZURA EDO IPP<br />

7-70<br />

DRAFT EIA REPORT