22.01.2014 Views

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Ref<br />

#<br />

Potential<br />

impact<br />

Desired<br />

Outcome<br />

disruption to during<br />

local culture construction.<br />

and impacts<br />

due to unmet<br />

expectations<br />

for local<br />

employment<br />

and<br />

procurement;<br />

• Physical<br />

impacts due<br />

to noise and<br />

dust<br />

pollution;<br />

• <strong>Impact</strong>s to<br />

physical<br />

health due to<br />

community<br />

interactions;<br />

• Safety risk<br />

associated<br />

with heavy<br />

traffic and<br />

laying of the<br />

gas pipeline<br />

and the<br />

transmission<br />

line; and<br />

• Psychological<br />

stress and<br />

possible<br />

physical<br />

impacts<br />

associated<br />

with<br />

tensions.<br />

2.12 Potential<br />

workplace<br />

health and<br />

Minimise the<br />

likelihood of<br />

incidents<br />

Description of mitigation<br />

awareness and prevention program which will include<br />

voluntary testing, the provision of condoms, and education<br />

of the workforce and local communities;<br />

• Communication of Project transport plans;<br />

• Grievance mechanism;<br />

• Establish parameters around use of security forces to<br />

support the Project;<br />

• Risk Assessment reviewing the safety risks of the gas<br />

pipeline and transmission line. The results of which will be<br />

included in the updated EMP;<br />

• Ensure that all contractors maintain HSE plans and review<br />

plans for prior to contract awards. All contractors to<br />

comply with <strong>Azura</strong> <strong>Power</strong>’s occupational health and safety<br />

guidelines and standards for general work practices, hours<br />

of work, air emissions, noise and light; and.<br />

• Consider investing in local health care facilities, and<br />

supporting them in carrying out ongoing monitoring of the<br />

health profile in the area.<br />

• Registration and regular communication with the nearby<br />

health care facilities;<br />

Performance<br />

Indicator<br />

Nigerian<br />

H&S law<br />

(Nigerian<br />

Monitoring<br />

Health and<br />

Safety<br />

Management<br />

Plan will set<br />

out<br />

monitoring<br />

requirements<br />

Emergency<br />

Response<br />

Plan,<br />

Timing/<br />

Frequency<br />

Prior to<br />

and<br />

throughou<br />

Responsibility Estimated<br />

Cost (USD)<br />

Health and<br />

Safety<br />

Management<br />

Plan will<br />

define the<br />

responsibility<br />

for managing<br />

the<br />

performance.<br />

<strong>Azura</strong> <strong>Power</strong><br />

will be<br />

responsible for<br />

the preparing<br />

the concerned<br />

plan.<br />

<strong>Azura</strong> <strong>Power</strong><br />

will have the<br />

responsibility<br />

Part of<br />

normal<br />

operations

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!