Convention Concerning the Protection of the World Cultural and Natural Heritage<br />

Sites (1972)<br />

The convention sets aside areas of cultural and natural heritage for protection.<br />

The latter is defined as areas with outstanding universal value from the<br />

aesthetic, scientific and conservation points of view.<br />

Convention on the Conservation of Migratory Species of Wild Animals (Bonn<br />

Convention) (1979)<br />

The Bonn Convention concerns the promotion of measures for the<br />

conservation (including habitat conservation especially for endangered<br />

species listed in Bonn) and management of migratory species.<br />

Montreal Protocol on Substances that Deplete the Ozone Layer (1987)<br />

The purpose of this protocol is to protect the ozone layer through enhanced<br />

international cooperation by taking precautionary measures to control<br />

equitably total global emissions of substances that deplete it. Signatories<br />

undertake to communicate statistics on annual production, imports and<br />

exports of the substances as indicated in the Protocol and to promote research<br />

and development activities and information exchange.<br />

African Convention on Conservation of Nature and Natural Resources (1968)<br />

The contracting countries undertook to adopt the measures necessary to<br />

ensure conservation, utilization and development of soil, water, flora and<br />

faunal resources in accordance with scientific principles and with due regard<br />

to the best interests of the people.<br />

1.4.8 International Best Practice Standards and Guidelines<br />

To help protect the security of the Project’s revenues, <strong>Azura</strong> <strong>Power</strong> is seeking<br />

to obtain a Partial Risk Guarantee from the World Bank’s International<br />

Development Association (IDA) together with insurance cover from the<br />

World Bank’s Multilateral Investment Guarantee Agency (MIGA).<br />

Development finance institutions such as the World Bank provide guidance<br />

on their requirements for the EIA process and place particular emphasis on<br />

achieving sustainable environmental, social and health outcomes.<br />

Such international institutions also provide environmental standards and<br />

limits for emissions and discharges. The overall project design and this EIA<br />

are based on relevant guidelines published by the World Bank and therefore<br />

are expected to meet the environmental requirements of potential lending<br />

institutions.<br />

The following international requirements and standards have been considered<br />

within the EIA process and are described below:<br />

• Equator principles (EP)<br />

AZURA EDO IPP<br />

1-21<br />

DRAFT EIA REPORT