Maintenance Event Routine Outage Duration<br />

Gas Turbine Hot Gas<br />

Path Inspections<br />

Performed at approximately 24,000 Factored Fired<br />

Hours for the gas turbine, or as modified by the<br />

mutual agreement of the Parties.<br />

Sixteen days<br />

Gas Turbine Major<br />

Overhaul<br />

Performed at approximately 48,000 Operating<br />

Hours for the gas turbine, or as modified by the<br />

mutual agreement of the parties. Generator Major<br />

Inspections will be performed in conjunction with<br />

the Gas Turbine Major Overhaul.<br />

Twenty-eight<br />

days<br />

Condition Monitoring<br />

Condition monitoring will be adopted as part of <strong>Azura</strong> <strong>Power</strong>’s O&M<br />

Company philosophy. The change in the various conditions measured will be<br />

fed back into the planned preventative maintenance system to adjust and<br />

optimise maintenance cycles. The condition monitoring will include the<br />

following:<br />

• Turbine on-line vibration monitoring;<br />

• Vibration monitoring of other key rotating equipment such as fans and<br />

pumps;<br />

• Thermal imaging;<br />

• Generator (cooling flow) condition monitoring;<br />

• Lube oil temperature and quality monitoring;<br />

• Transformer oil quality monitoring;<br />

• Ultrasonic leak detectors (to monitor the condition of steam traps and<br />

valves); and<br />

• Ultrasonic thickness measurements (on various pipework).<br />

3.6.2 Employment<br />

There will be approximately 50 permanent site employees onsite during<br />

commercial operations. These will include plant management staff,<br />

maintenance staff, skilled technicians, drivers, cleaning staff and a number of<br />

semi-skilled operators who will operate and maintain the <strong>Azura</strong>-<strong>Edo</strong> IPP<br />

plant.<br />

Further details are provided in Table 3.6 below.<br />

Table 3.6<br />

Overview of Employment Positions<br />

Job title<br />

Level of<br />

Skill<br />

Description<br />

A <strong>Plant</strong> Manager Skilled Operation and maintenance of the plant and<br />

the management of the business, will have<br />

field and operation and maintenance<br />

experience, and will be in charge of handling<br />

all contractual issues, of overseeing the<br />

operation of the Facility, and of leading and<br />

managing the rest of the team.<br />

Number of<br />

Positions<br />

1<br />

AZURA EDO IPP<br />

3-21<br />

DRAFT EIA REPORT