Approximately ten vehicles are expected to be used during operation, which<br />

may disrupt wildlife corridors, decrease the movement of certain species in<br />

the area, and delay migration. This would be particularly relevant for the<br />

local deer (Cervus elaphus), antelope (Tragelaphus species) and fox (Vulpes<br />

species), that were observed in the Study Area.<br />

<strong>Impact</strong> Significance<br />

The impacts during the operational phase are likely to be local and<br />

continuous. The magnitude is therefore considered to be negligible - low.<br />

As analysed for the construction phase, the sensitivity of the environment is<br />

considered to be high.<br />

The significance of the negative impacts on biodiversity during operation is<br />

considered to be of minor – moderate significance.<br />

7.7.3 <strong>Impact</strong> Description and Significance: Decommissioning<br />

<strong>Impact</strong> Description<br />

All infrastructure (including the cables and pylon for the connection to the<br />

Benin North Substation) will be dismantled. Machinery, steel and dismantled<br />

materials will be recycled where possible and disposed of at licensed disposal<br />

sites. In the short-term, the noise, dust and vehicle emissions generated<br />

during decommissioning may be similar to those observed during<br />

construction. Potential impacts may also relate to contamination from<br />

incorrect disposal of wastes generated during decommissioning.<br />

In the long-term, however, particularly if the site is rehabilitated, the<br />

ecological health and biodiversity could be restored over time.<br />

<strong>Impact</strong> Significance<br />

The impact of the Project on the biodiversity during decommissioning will be<br />

negative, temporary and local. The magnitude of the impact is therefore<br />

considered to be low.<br />

The sensitivity of the receptor is expected to remain the same as for the other<br />

Project phases, ie high.<br />

The impacts during decommissioning are therefore judged to be of moderate<br />

significance prior to mitigation.<br />

7.7.4 <strong>Impact</strong> Description and Significance: Summary<br />

A summary of the impacts of the Project on biodiversity is included in Table<br />

7.18 below.<br />

AZURA EDO IPP<br />

7-47<br />

DRAFT EIA REPORT