that PCR are impacted by project activities the developer is required to adhere<br />

to Nigerian legislation and, World Bank or any other international obligations.<br />

The following steps, which are integrated into the EIA process, will take<br />

account of the PCR in the area of interest: screening, developing a terms of<br />

reference (TOR), collecting baseline data, impact assessment and formulating<br />

mitigating measures and a management plan.<br />

If the Project is identified to have adverse impacts on PCR, the proponent<br />

must identify appropriate measures for avoiding or mitigating these impacts<br />

as part of the EIA. These measures may range from full site protection to<br />

selective mitigation, including salvage and documentation, in cases where a<br />

portion or all of the physical cultural resources may be lost. The proponent is<br />

also required to develop a PCR management plan.<br />

In addition, OP4.12 requires the proponent to engage with project-affected<br />

groups, concerned government authorities, and relevant non-governmental<br />

organisations to document the presence and significance of PCR, assess<br />

potential impacts, and explore avoidance and mitigation options. The<br />

findings of the physical cultural resources component of the EIA are disclosed<br />

as part of, and in the same manner as, the EIA report.<br />

OP 4.12 – Involuntary Resettlement<br />

According to the World Bank’s safeguard policy on Involuntary Resettlement,<br />

physical and economic dislocation resulting from World Bank funded<br />

developmental projects should be avoided or minimized as much as possible.<br />

Unavoidable displacement should involve the preparation and<br />

implementation of a RAP to address the direct economic and social impacts<br />

resulting from the resettlement. Under World Bank OP 4.12, the steps<br />

required for resettlement preparation and planning are as follows (World<br />

Bank, 2004):<br />

• Step 1. Land Acquisition Assessment: to establish the extent, location<br />

and current use of the land required for the Project.<br />

• Step 2. Avoid/Minimise Resettlement: seek alternative locations/routes<br />

for the Project.<br />

• Step 3. Household Census and Socioeconomic Survey: an inventory of<br />

persons displaced by the project and associated assets (including physical<br />

structures and land based assets such as crops and grazing land). They are<br />

usually conducted in close coordination with local government officials so<br />

that the data can be validated.<br />

• Step 4. Legal Framework: used as a basis for acceptance and enforcement<br />

of terms included in the RAP. It also enables eligibility criteria and<br />

entitlements to be decided based on relevant local and international<br />

requirements. This step defines the cut-off date for entitlements.<br />

AZURA EDO IPP<br />

1-24<br />

DRAFT EIA REPORT