The management of change procedure will ensure that:<br />

• proposed changes have a sound technical, safety, environmental, and<br />

commercial justification;<br />

• changes are reviewed by competent personnel and the impact of changes<br />

is reflected in documentation, including operating procedures and<br />

drawings;<br />

• hazards resulting from changes that alter the conditions assessed in the<br />

EIA have been identified and assessed and the impact(s) of changes do not<br />

adversely affect the management of health, safety or the environment;<br />

• changes are communicated to personnel who are provided with the<br />

necessary skills, via training, to effectively implement changes; and<br />

• the appropriate <strong>Azura</strong> <strong>Power</strong> person accepts the responsibility for the<br />

change.<br />

As information regarding the uncertainties becomes available, the Project<br />

ESMP will be updated to include that information in subsequent revisions.<br />

<strong>Environmental</strong> and social, as well as engineering feasibility and cost,<br />

considerations will be taken into account when choosing between possible<br />

alternatives.<br />

10.3 ADDITIONAL MANAGEMENT PLANS<br />

Additional detailed policies and plans will need to be developed to support<br />

the implementation of this ESMP and as part of the development of the <strong>Azura</strong><br />

<strong>Power</strong> ESMS. The timing of the development of the plans may be staged,<br />

ensuring that the appropriate focus and level of detail is provided for<br />

construction and operational activities. They will be finalised by <strong>Azura</strong><br />

<strong>Power</strong>, where appropriate in consultation with the FMEnv and other key<br />

stakeholders. A full list of the management plans for this Project are provided<br />

below and an overview of the contents on the key plans are provided in the<br />

relevant annexes:<br />

• Construction Management Plan;<br />

• Biodiversity Management Plan;<br />

• Traffic Control Management Plan (Annex C);<br />

• Construction Spoil and Waste Management Plan (Annex D);<br />

• Site Closure and Restoration Plan;<br />

• Influx Management Plan;<br />

• Comprehensive Community Investment Plan;<br />

• Local Employment and Procurement Policy;<br />

• Local Employment Strategy;<br />

• Occupational Health and Safety Management Plan (Annex E);<br />

• Spill Response Plan;<br />

AZURA EDO IPP<br />

10-7<br />

DRAFT EIA REPORT