8.13.2 Operation<br />

reduce the potential residual negative impacts during the construction phase<br />

to minor.<br />

Recommended mitigation measures for operation impacts to health are similar<br />

to the mitigation recommendations during construction outlined above. There<br />

should be a particular focus on maintaining the mitigation measures identified<br />

during construction, in particular the Traffic Management Plan and the<br />

workforce management protocol.<br />

• There will also need to be a focus on putting in place measures relating to<br />

fire and explosion risk management including:<br />

• Routine safety checks shall be carried out on the plant in line with<br />

standard safety procedures for power plants;<br />

• <strong>Azura</strong> workers shall be trained on basic safety procedures and<br />

environmental issues;<br />

• <strong>Azura</strong> shall maintain emergency and first line first aid at strategic locations<br />

through out the plant;<br />

• <strong>Azura</strong> will develop and shall maintain emergency and spill prevention and<br />

response/countermeasures plans for all phases of the project (this should<br />

include preparation for any accidental spillages or explosions from the gas<br />

supply line and transmission line); and<br />

• <strong>Azura</strong> will conduct community health and safety awareness campaigns for<br />

its workers and communities particularly around the presence of the gas<br />

pipeline and transmission line and the dangers of sabotage and what to do<br />

in the event of an emergency.<br />

Strict implementation of these mitigation measures and ongoing monitoring<br />

of effectiveness throughout the operation phase will result in the significance<br />

of negative residual negative impacts to health remaining minor.<br />

8.13.3 Decommissioning<br />

Assuming mitigation measures for health impacts during previous Project<br />

phases are implemented, the following measures are recommended to address<br />

residual health impacts following decommissioning:<br />

• Establish a contingency fund to address contamination of the<br />

surrounding environment prior to Project closure;<br />

• Ensure that any victims of health or safety impacts of the Project are<br />

rehabilitated with treatment and support that can continue after closure<br />

of the Project; and<br />

AZURA EDO IPP<br />

8-26<br />

DRAFT EIA REPORT

Hooray! Your file is uploaded and ready to be published.