2. Evaluation of the importance (or significance) of impacts taking the<br />

sensitivity of the environmental resources of human receptors into<br />

account.<br />

3. Development of mitigation measures to avoid, reduce or manage the<br />

impacts<br />

4. Assessment of residual significant impacts after the application of<br />

mitigation measures.<br />

Where significant residual impacts remain, further options for mitigation may<br />

be considered and impacts re-assessed until they are as low as reasonably<br />

practicable for the project.<br />

Figure 7.1<br />

Prediction, Evaluation and Mitigation of <strong>Impact</strong>s<br />

Predict Evaluate M itigate Residual<br />

Im pact<br />

W hat could<br />

happen as a<br />

consequence of<br />

the project<br />

activities?<br />

Is it<br />

im portant/<br />

significant?<br />

W hat can<br />

be done<br />

about it?<br />

Is an im pact<br />

still significant<br />

or not reduced<br />

To ALARP?<br />

The current<br />

design<br />

and the<br />

m itigation<br />

incorporated<br />

Stakeholders<br />

can help<br />

to decide this, eg<br />

through ongoing<br />

consultation and<br />

w orkshops<br />

Interact w ith<br />

Design<br />

(and<br />

stakeholders)<br />

to develop<br />

solutions<br />

For som e<br />

impacts the<br />

sequence m ay<br />

need to be<br />

repeated<br />

7.2.1 Defining <strong>Impact</strong>s<br />

There are a number of ways that impacts may be described and quantified.<br />

The definitions adopted for this EIA are described in Box 7.1 below.<br />

Box 7.1<br />

Definitions of <strong>Impact</strong>s<br />

1. Nature of <strong>Impact</strong>:<br />

An impact is essentially any change to a resource or receptor brought about by the presence of a<br />

project component or by the execution of a project related activity.<br />

Negative – an impact that is considered to represent an adverse change from the baseline or to<br />

introduce a new undesirable factor.<br />

Positive – an impact that is considered to represent an improvement to the baseline or to<br />

introduce a new desirable factor.<br />

AZURA EDO IPP<br />

7-3<br />

DRAFT EIA REPORT