• SO 2. The SO 2 levels (ppm) were recorded at 0.1 ppm at two of the sampling<br />

locations, however at several locations SO 2 was not detected during the dry<br />

season, with no SO 2 detected during the wet season sampling.<br />

• TSP. The approximate concentration level of TSP matter of 10 µm in size -<br />

PM 10) was given between 2.6 – 4.6 and 1.2 – 4.1 µg/m3 for the dry and wet<br />

seasons respectively.<br />

NO 2. The results of the ambient air quality survey are indicative of a relatively<br />

clean air shed with values within the Nigerian Ambient Air Quality Standards,<br />

and international WHO standards for NO 2. This may be reflective of the rural<br />

nature of the environment with little or no existing emissions sources.<br />

Ambient air quality was monitored across ten locations including the Orior-<br />

Osemwende, Ihovbor-Evboeka and Idunmwowina-Urho-Nisen communities.<br />

In addition, a control site was selected 1 km from the Project site. The results<br />

demonstrated that the NO 2 levels did not go above 0.02 ppm across both the<br />

wet and dry seasons.<br />

4.8 AMBIENT NOISE ENVIRONMENT<br />

The site is directly accessed via a tarred road connecting the Project site to the<br />

Benin City Bypass, a major expressway approximately 3 km to the east of the<br />

Site. Surrounding communities engage in informal trading, slash and burn<br />

agriculture and some employment in the formal sector. It is anticipated that the<br />

main underlying sources of noise will be road traffic and farming activities and<br />

short-term construction noise from the neighbouring NIPP.<br />

The measurement of ambient noise levels were recorded using an Extech<br />

Integrating Sound Level Meter (model number 407780). A total of eight<br />

sampling locations were selected during the dry season including a sampling<br />

location in close vicinity to the Ihovbor-Evboeka community. A total of ten<br />

sampling locations were chosen during the wet season including the<br />

transmission line corridor, and the Orior-Osemwende and Ihovbor-Evboeka<br />

communities. The results of the noise sampling are illustrated in Table 4.6.<br />

Table 4.6<br />

Noise Data - Wet and Dry Season<br />

Sample Code<br />

Noise Level - dB (A)<br />

Wet Season<br />

Dry Season<br />

A1 53.8 49.9<br />

A2 50.4 53.7<br />

A3 51.3 51.2<br />

A4 49.6 58.5<br />

A5 45.0 47.0<br />

A6 46.0 54.5<br />

AZURA EDO IPP<br />

4-22<br />

DRAFT EIA REPORT