22.01.2014 Views

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

IHVB8<br />

IHVB9<br />

Wet Season<br />

Dry Season<br />

34.6 31.6<br />

33.6 34.5<br />

33.6 34.5<br />

34.5 32.5<br />

34.4 34.4<br />

33.5 33.5<br />

33.4 45.1<br />

34.5 38.5<br />

34.4 38.4<br />

34.6 39<br />

33.6 44<br />

IHVB10<br />

33 35<br />

33.1 35.1<br />

34 45.1<br />

33.1 45.1<br />

Average Overall 34 37<br />

The average overall for the NIPP site and surrounds is 34 dB (A) during wet<br />

season and 37 dB (A) during the dry season. As with standard methodology,<br />

the baseline noise levels are therefore considered to be below the <strong>IFC</strong> Noise<br />

Level Guidelines for daytime, 55 dB(A) LAeq, 15hr, and 45 dB(A) LAeq, 9hr, for<br />

night time for residential, institutional or educational receptors.<br />

4.9 TERRESTRIAL ECOLOGY<br />

4.9.1 Flora<br />

The assessment of vegetation was conducted to provide information on:<br />

• floristic composition;<br />

• plant species including the presence or absence of species;<br />

• profile of the vegetation type; and<br />

• inventory of economic plants including any crops of medicinal value.<br />

The identification of species was conducted both in situ and ex situ.<br />

Representative samples of plant species were collected and prepared as<br />

standard herbarium species, to serve as a record of the vegetative composition<br />

of the area and identification of those species not identified in the field.<br />

A combination of line and belt transect were used for the rapid assessment of<br />

the vegetation types. The belt transect used a 10 m by 5 m plot size. The<br />

sampling included locations at either end of the proposed Project site with<br />

seven points sampled in total during the dry season. The same sampling points<br />

were also chosen during the wet season to include the proposed Site in addition<br />

to the southern and south-eastern portions of the Project site. Figure 4.7<br />

illustrates the sampling locations for surveying vegetation.<br />

AZURA EDO IPP<br />

4-24<br />

DRAFT EIA REPORT