Following implementation of the mitigation measures outlined above, it is<br />

anticipated that the impact magnitude will be reduced to insignificant. The<br />

overall residual significance of the impact will therefore become insignificant.<br />

8.3.3 Decommissioning<br />

The mitigation measures identified during construction shall be most relevant<br />

for the decommissioning phase. Apart from implementing the mitigation<br />

measures identified above, there shall be concentrated effort on the following<br />

mitigation measures:<br />

• Minimisation of concentrated transportation and excavation during<br />

decommissioning to reduce erosion;<br />

• Rehabilitation and revegetation of cleared areas adjacent to the Project site<br />

which shall include the re-vegetation of bare soils before the next wet<br />

season.<br />

• Development and implementation of a waste management plan (as part of<br />

the ESMP) to ensure that waste is disposed of correctly such that soil<br />

contamination is minimised.<br />

Following the implementation of the mitigation measures the magnitude may<br />

decreased to negligible - low. The residual impact is therefore assessed to be<br />

of insignificant – minor significance.<br />

8.4 WATER RESOURCES<br />

8.4.1 Construction<br />

The following mitigation measures shall be implemented during construction<br />

for the prevention of contamination of water resources:<br />

• Ensure proper placement of soil stockpiles to reduce exposure of<br />

sediment-generating materials to wind or water;<br />

• Reduce or prevent off-site sediment transport using appropriate methods<br />

such as effective site drainage, and sediment/silt trapping mechanisms;<br />

• Design permanent drainage installations for heavy rainfall events and<br />

protect stormwater channels using slope, limitation techniques, rip-rap<br />

and lining;<br />

• Any hydrocarbons, fuels, lubricants and chemicals to be used will be<br />

stored in bunded and lockable oil storage tanks, with hoses and gauges<br />

kept within the bund. Regular checking and maintenance of all plant and<br />

machinery to minimise the risk of fuel or lubricant leakages;<br />

AZURA EDO IPP<br />