• Screening and scoping<br />

• Baseline data collection<br />

• Stakeholder consultation<br />

• <strong>Impact</strong> assessment<br />

• Management plans<br />

• Reporting and disclosure<br />

A brief description of each step is provided below.<br />

Screening and Scoping<br />

A project proposal containing a summary of the proposed project was submitted<br />

to Federal Ministry of Environment (FMEnv) for their Initial <strong>Environmental</strong><br />

Evaluation (IEE) to determine the project’s category under the study activities<br />

list.<br />

Following this, a scoping report, including Terms of Reference (ToR) for the EIA<br />

and an application form, was submitted to FMEnv on 20 December 2010. The<br />

report contained a description of the project, a description of the existing<br />

environmental and socio-economic baseline, a preliminary assessment of the<br />

potential environmental and social impacts, identification of key data gaps and<br />

stakeholder input from the consultation process. The scoping report was<br />

approved on 21 February 2011 and the Project placed in Category I, requiring a<br />

mandatory EIA Study and a panel review exercise.<br />

Baseline data collection<br />

Available data was gathered as a basis against which the impacts of the project<br />

can be assessed. In addition to a desktop review of existing reports such as EIAs<br />

and the neighbouring NIPP plant, primary data was collected by field studies<br />

carried out by biophysical and socio-economic specialists as indicated in Table 1.<br />

Table 1<br />

Fieldwork for Baseline Data Collection<br />

Data Collection Date Team<br />

Dry season biophysical data 19 – 21 March 2011 EnvAccord<br />

collection<br />

Qualitative data collection 19 – 13 June 2011 Janice Olawoye and team<br />

Wet season biophysical data<br />

collection<br />

Socio-economic enumeration<br />

survey<br />

24- 26 July 2011 EnvAccord<br />

22 – 26 August 2011 Janice Olawoye and team<br />

Stakeholder Consultation<br />

The public participation process comprised the following activities:<br />

AZURA EDO IPP<br />