e generated, such as used lubricating and hydraulic oils (from vehicles and<br />

machinery), filters: air and oil filters, batteries (mainly lead-acid batteries) and<br />

washout water from concrete mixing plant. In addition, general refuse,<br />

similar to domestic waste, will be generated by the construction workforce at<br />

the work site, comprising food residues, paper, used bottles and cans,<br />

packaging and broken furniture.<br />

Sewage and wastewater will be generated by the sanitation facilities provided<br />

for the construction workforce. Septic tanks will be installed and used for the<br />

treatment of sewage generated at the construction site.<br />

Incorrect disposal of these wastes could result in leaching and the<br />

contamination of soil and water resources, which could have secondary<br />

impacts on local community health, and restrict the use of the water obtained<br />

from these sources. The use of existing dumpsites could worsen existing<br />

environmental problems at these sites, namely windblown litter, vermin and<br />

other disease vectors as well as potential health impacts from the direct<br />

contact of scavengers with the waste. In addition, there are nuisance impacts<br />

related to the dust creation and impacts from the transport of rubble to<br />

disposal sites.<br />

<strong>Impact</strong> Significance<br />

The scale of the potential impact of the incorrect disposal of wastes generated<br />

during construction is regional, as the impacts of disposal would extend<br />

beyond the Project site and immediate vicinity. The impacts are deemed to be<br />

long-term as the impacts will be felt after the end of the construction phase.<br />

The magnitude is therefore considered to be moderate.<br />

The sensitivity of the receptors is considered to be moderate.<br />

The overall impacts of waste creation, handling and disposal during<br />

construction are therefore considered to be of moderate significance prior to<br />

mitigation.<br />

7.8.2 <strong>Impact</strong> Description and Significance: Operational<br />

<strong>Impact</strong> Description<br />

During the operational phase of the Project there will be a number of wastes<br />

generated from the Project processes (process wastes) and a range of other<br />

wastes from the transport operations and administration associated with the<br />

Project. The main process waste streams created during the operation of the<br />

proposed power plant will comprise air intake filters, used lubricating oils<br />

from plant machinery and vehicles, used hydraulic oils, sludge from the<br />

wastewater treatment plant, process sludge, separated oil sludge from<br />

oil/water separators, oily rags and used chemical containers.<br />

AZURA EDO IPP<br />

7-49<br />

DRAFT EIA REPORT