22.01.2014 Views

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 4.12<br />

Fallow Land with Guinea Grass (Panicum maximum) and Oil Palm Trees<br />

(Elaeis guneensis) at the Proposed Site – Dry Season<br />

Source: <strong>Environmental</strong> Accord Nigeria Limited, 2011<br />

Figure 4.13<br />

A rubber plantation (Hevea brasiliensis) at the Project Site (mixture of old and<br />

young trees (5-10 years old) occupying approximately 250m²at 1m interval) –<br />

Dry Season<br />

Source: <strong>Environmental</strong> Accord Nigeria Limited, 2011<br />

AZURA EDO IPP<br />

4-29<br />

DRAFT EIA REPORT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!