8.5.2 Operation<br />

• After construction, rehabilitate and revegetate disturbed areas to the<br />

extent that this is feasible.<br />

With the implementation of the mitigation measures, the residual impact<br />

magnitude will become medium and the residual impact on biodiversity will<br />

be reduced to moderate significance during construction.<br />

The following mitigation measures shall be implemented in the construction<br />

phase of the Project:<br />

• Security and work lighting (both during construction and operation) shall<br />

be shielded and directed downwards to prevent side-spill; the use of tall<br />

mast lights shall be carefully assessed, and avoided if possible, to minimise<br />

light impacts both during construction and operation;<br />

• Implementation of the BMP and refresher training for all staff to ensure<br />

that they are aware of all measures to protect floral and faunal species in<br />

the Study Area;<br />

• Ensure that all staff receive training on the ecological sensitivities to<br />

minimise disturbance to floral and faunal species particularly those<br />

identified to be of an elevated ecological status. Staff will be trained so that<br />

they are aware of any specific migratory routes for faunal species, and an<br />

enforcement of an anti-poaching policy. In addition drivers will receive<br />

training to ensure safe driving techniques particularly near or through<br />

nocturnal and migratory routes with appropriate speed limits established<br />

and enforced;<br />

• Control of any invasive floral species that may occur on the site<br />

boundaries as a result of clearing the vegetation. This shall be managed<br />

through the re-vegetation strategy.<br />

With the implementation of the mitigation measures during operation, the<br />

residual impact magnitude will be insignificant and the residual impact on<br />

biodiversity will be reduced to minor significance.<br />

8.5.3 Decommissioning<br />

The mitigation measures identified for the decommissioning phase will follow<br />

those identified for the construction phase. This is largely due to the fact that<br />

the level of disturbance during this phase will mirror that observed during<br />

construction.<br />

Focused attention shall be on the re-vegetation of the Study Area, attempting<br />

to return the site to its original status. One of the core aims of the mitigation<br />

measures implemented during this phase shall be to increase and re-establish<br />

AZURA EDO IPP<br />

8-12<br />

DRAFT EIA REPORT