<strong>Impact</strong>s<br />

Management Plans<br />

<strong>Impact</strong>s to Employment and • Employment and Workforce Policy;<br />

Economy<br />

• Comprehensive Community Investment Plan;<br />

• Local Employment and Procurement Policy; and<br />

• Local Employment Strategy.<br />

<strong>Impact</strong>s to Infrastructure • Influx Management Plan; and<br />

• Comprehensive Community Investment Plan.<br />

<strong>Impact</strong>s to Health Profile • Traffic Management Plan,<br />

10.4 CHECKING AND CORRECTIVE ACTION<br />

10.4.1 Introduction<br />

Checking includes inspections and monitoring as well as audit activities to<br />

confirm proper implementation of checking systems as well as effectiveness of<br />

mitigations. Corrective actions include response to out-of-control situations,<br />

non-compliances, and non-conformances. Actions also include those intended<br />

to improve performance.<br />

10.4.2 Inspection<br />

EHS inspections will be conducted weekly on an ad hoc basis and formally at<br />

least once every six months. The results of the inspection activities will be<br />

reported to <strong>Azura</strong> <strong>Power</strong> to be addressed.<br />

10.4.3 Monitoring<br />

Monitoring will be conducted to ensure compliance with regulatory<br />

requirements as well as to evaluate the effectiveness of operational controls<br />

and other measures intended to mitigate potential impacts. Monitoring<br />

parameters are included in the ESMP.<br />

Monitoring methodologies or processes must be put in place in order to<br />

ensure the efficacy of the mitigation measures identified in the EIA.<br />

Monitoring methodologies should be established to address the following:<br />

• alteration to the biological, chemical, physical, social and health<br />

characteristics of the recipient environment;<br />

• alterations in the interactions between project activities and environmental<br />

sensitivities, and interactions among the various sensitivities;<br />

• to monitor the effectiveness of the mitigation measures;<br />

• determination of long term and residual effects; and<br />

• identification of Project specific cumulative environmental effects.<br />

The FMEnv guidelines require an environmental monitoring plan as part of an<br />

EIA. The aim of the monitoring programme is to ensure that the negative<br />

environmental impacts identified in this EIA are effectively mitigated in the<br />

AZURA EDO IPP<br />

10-9<br />

DRAFT EIA REPORT