• Emission levels of NOx at 20ppm, and CO at 30ppm (see Section 3.2.12).<br />

High Voltage Switchgear<br />

The dimensions of the high voltage switchyard are based on 330 kV air<br />

insulated switchgear, with an arrangement of one bus section breaker and two<br />

bus coupler breakers. The configuration allows for six incoming overhead line<br />

circuits from the power plant ie four from the four OCGT gas turbine<br />

generator transformers and two from the future steam turbine generator<br />

transformers. There will also be two outgoing overhead line circuits.<br />

3.2.4 Generator Specifications<br />

The exact type of generator will be determined in the detailed negotiations<br />

with the EPC contractor and will be subject to a competitive bidding process.<br />

The generator rating would be 112.500 MW (140.625 MVA) with a terminal<br />

voltage of 15 kV, a rated voltage of 50 Hz and a rated speed of 3000 RPM. The<br />

rated power factor will be 0.8 (lagging) and the generator efficiency between<br />

98.5 to 98.8 percent depending on the unit load. Each generator will have<br />

automatic voltage regulator and a turbine speed control governor. A totally<br />

enclosed water-to-air cooling system will be used with re-cooling by air-water<br />

(fin fan) heat exchangers. The generators shall be equipped with a protection<br />

scheme to protect and prevent damage to the plant.<br />

3.2.5 Electricity Distribution from the <strong>Power</strong> <strong>Plant</strong><br />

The OCGT power plant will have four transformers that will step up the<br />

voltage from 15 kV, at the gas turbine generator terminals, to the transmission<br />

voltage of 330 kV. Electricity will then be fed over a short length of overhead<br />

cable to an air-insulated switchyard before being exported via overhead cables<br />

on a single tower or by underground cable, to the major new substation at<br />

Benin North.<br />

The switchyard will consist of circuit breakers and other high voltage<br />

electrical equipment together with associated supporting steel structures.<br />

At the substation there will be at least two main busbars where SF 6 (sulfur<br />

hexaflouride) is used. The SF 6 is used to extinguish the arc caused when a<br />

circuit breaker is opened, either by a control switch or due to a fault.<br />

Disconnectors or isolating switches (manually or automatically operated) are<br />

included on either side of each circuit breaker to allow for electrical isolation<br />

during maintenance work.<br />

The electricity will then flow either onto the National Grid or via the Benin<br />

North 330/132 kV transformers or the Benin North 132/33kV transformers<br />

into Benin City and surroundings.<br />

The Project intends to contract for the supply of power at the national level.<br />

<strong>Azura</strong> <strong>Power</strong> is currently negotiating a <strong>Power</strong> Purchase Agreement (PPA)<br />

with the Nigerian Bulk Electricity Trading PLC (NBET), a Federal<br />

AZURA EDO IPP<br />

3-7<br />

DRAFT EIA REPORT