Details of the asset census survey and other activities associated with the RAP<br />

are provided in Section 7.10.1 of the impacts chapter. Further details are also<br />

provided the associated Project RAP.<br />

6.4.6 Stage 3: EIA Disclosure<br />

As part of the formal regulatory process, FMEnv will disclose the draft EIA<br />

report for the Project and invite public comments. ERM will consult with the<br />

FMEnv regarding the disclosure process and notification to ensure it is done<br />

to Word Bank standards, and to facilitate any further disclosure requirements.<br />

Public stakeholders at both the state and LGA levels will be invited to provide<br />

their input, most likely with a public hearing being conducted by the FMEnv<br />

as part of their review activities. This notification is typically done through a<br />

newspaper announcement and is currently planned to be undertaken in<br />

December 2011.<br />

There will be simultaneous disclosure of the draft EIA report on the World<br />

Bank InfoShop website which the The FMEnv will be notified about.<br />

6.4.7 Stage 4: Project Execution<br />

This stage involves ongoing engagement after submission of the EIA.<br />

Engagement activities will be carried out to monitor implementation and<br />

effectiveness of mitigation measures. The engagement activities will also be<br />

designed to build on positive stakeholder relationships established during the<br />

EIA and carry these forward through Project implementation and operation.<br />

The grievance mechanism as illustrated in Section 6.6 will be implemented to<br />

be effective throughout the Project lifecycle. The mechanism will be advertised<br />

and announced to all affected stakeholders to ensure stakeholders are fully<br />

informed about how to implement the grievance procedure. .Thus throughout<br />

the Project execution there will be ongoing engagement between stakeholders<br />

and <strong>Azura</strong> <strong>Power</strong>.<br />

Stakeholder consultation activities and specific discussion areas for Stages 1<br />

and 2 of the stakeholders engagement process are detailed in Table 6.1 below.<br />

AZURA EDO IPP<br />

6-10<br />

DRAFT EIA REPORT