• Consultation with local community leaders and groups of key<br />

stakeholders in Orior-Osemwende (Figure 6.1), Ihovbor-Evboeka (Figure<br />

6.2) and Idunmwowina-Urho-Nisen (Figure 6.3) communities to provide<br />

them with an overview of the proposed Project, the EIA process, potential<br />

project impacts and to discuss likely mitigation measures. This was<br />

carried out alongside the collection of further baseline data using<br />

qualitative and consultative processes to better understand the socioeconomic<br />

context of the Project area, stakeholders and their perceptions of<br />

the Project.<br />

• Meetings and correspondence with NGOs and research institutions for the<br />

gathering of baseline information.<br />

This stage of stakeholder engagement was completed in November 2011.<br />

Figure 6.1<br />

Community Engagement in Orior-Osemwende Community<br />

AZURA EDO IPP<br />

6-5<br />

DRAFT EIA REPORT