<strong>Impact</strong> Significance<br />

The extent of impacts to workplace H&S will mainly be local, although in<br />

cases where serious health related accidents occur the impacts will be beyond<br />

the local level (treatment at state level health care facilities or internationally).<br />

The duration of most (negative) impacts will be limited to the 24 to 36 months<br />

of the construction phase, although if there is a severe injury (or fatality), this<br />

impact would be permanent. The probability of the impact occurring is<br />

considered to be likely prior to mitigation. The overall magnitude of the<br />

impact on workplace H&S is therefore assessed to be moderate and negative<br />

prior to mitigation. As the sensitivity of the receptors, is considered to be<br />

high, the overall significance of the impact on workplace H&S is considered to<br />

be major prior to mitigation.<br />

7.16.2 <strong>Impact</strong> Description and Significance: Operation<br />

During operation, the likely impacts to workplace H&S will include accidents<br />

relating to machinery operation, trips and falls, falling from heights, electrical<br />

related incidents and explosions and accidents related to traffic movement on<br />

site.<br />

<strong>Impact</strong> Significance<br />

The extent of the impacts relating to accidents will be local and on site. The<br />

duration of impacts will be long-term or permanent, depending on the<br />

severity of health consequences. The probability of impacts occurring is likely<br />

prior to mitigation and the magnitude of the impact is considered to be high.<br />

As the sensitivity of the receptors, is considered to be high, the overall<br />

significance of the impact on workplace H&S during operation is considered<br />

to be major prior to mitigation.<br />

7.16.3 <strong>Impact</strong> Description and Significance: Decommissioning<br />

<strong>Impact</strong> Description<br />

Activities related to demolition, decommissioning, heavy vehicle traffic on site<br />

and potential additional habitat for mosquito-breeding will pose workplace<br />

H&S risks. In particular, the following negative health impacts have been<br />

identified during the decommissioning phase of the Project:<br />

• Physical health impacts due to noise and dust pollution on site;<br />

• <strong>Impact</strong>s to physical health of employees due to infectious disease and<br />

vectors and/or water-borne diseases such as malaria; and<br />

• Physical H&S impacts resulting from any accidents occurring on and<br />

around site including trips, falls, operation of machinery, movement of<br />

plant on site and incidents (eg electrocution and explosions) associated<br />

with the decommissioning of the transmission line and gas piping and<br />

pipeline.<br />

AZURA EDO IPP<br />

7-79<br />

DRAFT EIA REPORT