Stakeholder Engagement Engagement Activity Stakeholders Specific Discussion Areas Timing<br />

Engagement with NGO<br />

November 2011<br />

sector<br />

• Meeting with<br />

Nigerian<br />

Conservation<br />

Foundation (NCF)<br />

• NGO representatives • Confirming that there are no protected areas within the Project site;<br />

• Proximity of the Project to the Sokka pipeline;<br />

• Implementation and monitoring within the operational phase;<br />

• Need for detailed mapping;<br />

• Concerns over erosion;<br />

• Need to community engagement, especially regarding bush fires<br />

close to the pipeline; and<br />

• Including the technical specifications for the gas pipeline.<br />

Stage 2A<br />

Resettlement Action Plan<br />

• Training for local<br />

Government officials<br />

• Officials from the<br />

Ministry of Land and<br />

Surveys.<br />

• Key Project risks;<br />

• Criteria around resettlement, including WB standards and process;<br />

• Procedures for stakeholder engagement; and<br />

• Eligibility and entitlement for compensation as part of the RAP.<br />

June 2011<br />

• Detailed Enumeration<br />

Study for RAP<br />

• Communities of Orior-<br />

Osemwende, Ihovbor-<br />

Evboeka and<br />

Idunmwowina-Urho-<br />

Nisen.<br />

• Collection of socio-economic baseline data;<br />

• Enumeration of physical and cultural community resources;<br />

• Description of Project and EIA;<br />

• Upcoming asset census survey; and<br />

• Cut-off date for census survey.<br />

August 2011<br />

• Asset Census Survey<br />

for RAP<br />

• Communities of Orior-<br />

Osemwende, Ihovbor-<br />

Evboeka and<br />

Idunmwowina-Urho-<br />

Nisen.<br />

• Household and community socio-economic conditions;<br />

• Enumeration and valuation of household assets;<br />

• Enumeration and valuation of land and livelihood assets; and<br />

• Public perceptions of the Project<br />

October 2011