22.01.2014 Views

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Ref<br />

#<br />

Potential<br />

impact<br />

applied work<br />

experience.<br />

2.10 The main<br />

impacts to<br />

infrastructure<br />

will be<br />

associated with<br />

the influx of<br />

opportunistic<br />

job seekers,<br />

including:<br />

• Increased<br />

pressure onto<br />

overburdene<br />

d<br />

infrastructure<br />

services;<br />

• Increased<br />

household<br />

waste and<br />

the inability<br />

to dispose of<br />

this safely;<br />

• Pressure on<br />

water<br />

resources;<br />

and<br />

• Disruption to<br />

road access<br />

from Project<br />

vehicles.<br />

Desired<br />

Outcome<br />

Minimise any<br />

increase in<br />

pressure on<br />

infrastructure<br />

and services<br />

associated<br />

with influx of<br />

workers and<br />

job seekers<br />

Description of mitigation<br />

• Develop and implement Community Investment plan<br />

which will include the potential distribution of power to<br />

local communities (it will not include payment for<br />

transformers, pre-paid metres etc);<br />

• Influx Management Plan;<br />

• Traffic Management Plan and conduct associated detailed<br />

Traffic Study to inform its development;<br />

• Detailed rehabilitation and implementation framework as<br />

a part of the RAP; and<br />

• Regular monitoring of water quality in local communities<br />

to identify incidences of contamination and respond<br />

appropriately.<br />

Performance<br />

Indicator<br />

Adherence to<br />

the <strong>IFC</strong><br />

Performance<br />

Standards<br />

Monitoring<br />

The<br />

Community<br />

Investment<br />

and Influx<br />

Management,<br />

Plans and the<br />

RAP will<br />

outline<br />

monitoring<br />

requirements<br />

Timing/<br />

Frequency<br />

Througho<br />

ut<br />

constructi<br />

on<br />

Responsibility Estimated<br />

Cost (USD)<br />

The<br />

Community<br />

Investment<br />

and Influx<br />

Management,<br />

Plans along<br />

with RAP will<br />

define the<br />

responsibility.<br />

<strong>Azura</strong> <strong>Power</strong><br />

is primary<br />

responsible for<br />

preparing the<br />

plans.<br />

Part of EHS<br />

Coordinator’<br />

s duties<br />

2.11 Possible health<br />

impacts:<br />

• Psychological<br />

impacts<br />

associated<br />

with influx of<br />

outsiders and<br />

Minimise<br />

impacts of a<br />

new<br />

workforce on<br />

community<br />

health and<br />

wellbeing<br />

• Local Employment Strategy;<br />

• Traffic Management Plan;<br />

• Workforce management protocols;<br />

• Encourage the construction workforce to undergo testing<br />

(<strong>Azura</strong> and contractors) for sexually transmitted infections<br />

(STIs);<br />

• Health awareness programme incorporating an HIV/AIDS<br />

Nigerian<br />

labour law<br />

and the<br />

Adherence to<br />

the <strong>IFC</strong><br />

Performance<br />

Standards<br />

The<br />

Occupational<br />

Health and<br />

Safety<br />

Management<br />

Plan and<br />

Community<br />

Througho<br />

ut<br />

constructi<br />

on<br />

The<br />

Occupational<br />

Health and<br />

Safety<br />

Management<br />

Plan and<br />

Community<br />

Part of<br />

normal<br />

operations

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!