22.01.2014 Views

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 10.5<br />

Operational Phase: <strong>Environmental</strong> and Social Management Measures<br />

Ref<br />

#<br />

Potential impact<br />

Desired<br />

Outcome<br />

Description of mitigation<br />

Performance<br />

Indicator<br />

Monitoring<br />

Timing/<br />

Frequency<br />

Responsibility Estimated<br />

Cost (USD)<br />

3.1 The negative air<br />

quality impacts<br />

predicted during<br />

operation are<br />

related to the<br />

following:<br />

• Process<br />

emissions (NOx<br />

and CO);<br />

• Cumulative<br />

process<br />

emissions (NOx<br />

and CO);<br />

• Greenhouse gas<br />

emissions<br />

(which exceed<br />

the <strong>IFC</strong><br />

Performance<br />

Standard 3 for<br />

Pollution<br />

Prevention and<br />

Abatement<br />

threshold for a<br />

single project/<br />

development of<br />

100 kilo tonnes<br />

CO2-<br />

equivalents per<br />

year)<br />

Emissions<br />

limited to<br />

minimise<br />

impact on<br />

human<br />

health.<br />

• Dry low NOx combustion system;<br />

• However all vehicles used should be regularly<br />

maintained; and<br />

• Emissions monitoring for NOx.<br />

The <strong>IFC</strong><br />

Performance<br />

Standards<br />

The WHO<br />

and EU<br />

Emission<br />

Standards<br />

Nigerian<br />

Emission<br />

Standards<br />

Emissions<br />

monitoring.<br />

Details to be<br />

agreed with<br />

FMEnv prior<br />

to operation.<br />

Monthly<br />

HSE<br />

Coordinator,<br />

<strong>Azura</strong> <strong>Power</strong><br />

with<br />

subcontractors<br />

if necessary<br />

Cost of<br />

ambient air<br />

monitoring<br />

programme:<br />

(approx 1,000<br />

USD for setup<br />

costs;<br />

2,000 USD<br />

for sampling<br />

and analysis<br />

per<br />

monitoring<br />

event. Stack<br />

monitoring:<br />

approx<br />

20,000 USD<br />

per year)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!