22.01.2014 Views

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 10.3<br />

Design Phase: <strong>Environmental</strong> and Social Management Measures<br />

Ref<br />

#<br />

Potential<br />

impact<br />

Desired<br />

Outcome<br />

Description of mitigation<br />

Performance<br />

Indicator<br />

Monitoring<br />

Timing/<br />

Frequency<br />

Responsibilit<br />

y<br />

Estimated<br />

Costs USD)<br />

1.1 Waste <strong>Impact</strong>s Ensure<br />

responsible<br />

waste disposal<br />

and minimise<br />

contamination<br />

• Identify a licensed waste disposal facility in Port<br />

Harcourt for general and hazardous wastes and confirm<br />

that required capacity exists for disposal during<br />

construction and operational phases.<br />

In<br />

accordance<br />

with<br />

Nigerian<br />

legislation<br />

Copies of<br />

corresponden<br />

ce<br />

Prior to<br />

constructi<br />

on<br />

<strong>Azura</strong> <strong>Power</strong><br />

Costs<br />

associated<br />

with<br />

identification<br />

and<br />

inspection<br />

(approx 2,000<br />

USD)<br />

1.2 Key impacts<br />

identified due<br />

to physical<br />

resettlement:<br />

• Loss of<br />

physical<br />

assets;<br />

• Loss of<br />

cultural sites;<br />

• Loss of land;<br />

and<br />

• Loss of<br />

productive<br />

agricultural<br />

land.<br />

Minimise<br />

amount of<br />

physical<br />

resettlement<br />

required,<br />

where possible.<br />

• Implementation of an international standard RAP.<br />

• Ensure that sacred sites are relocated in close<br />

consultation and negotiation with traditional religious<br />

leaders, with appropriate monitoring. The<br />

implementation measures will be outlined in the Physical<br />

Cultural Resources Management Plan;<br />

Adherence to<br />

the <strong>IFC</strong><br />

Performance<br />

Standards<br />

The RAP will<br />

set out<br />

monitoring<br />

requirements<br />

Grievance<br />

mechanism<br />

records<br />

Preconstructi<br />

on phase<br />

and<br />

throughou<br />

t the<br />

Project<br />

<strong>Azura</strong> <strong>Power</strong><br />

To be<br />

determined<br />

based on the<br />

outcome of<br />

RAP

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!