22.01.2014 Views

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

Azura-Edo Independent Power Plant Environmental Impact ... - IFC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Ref<br />

#<br />

Potential impact Desired<br />

Outcome<br />

4.11 Decommissionin<br />

g will not result<br />

in any new<br />

impacts to<br />

health; however<br />

closure of the<br />

Project could<br />

remove any<br />

treatment or<br />

support for<br />

victims of health<br />

impacts<br />

manifested<br />

during Project<br />

construction or<br />

operation.<br />

Minimise any<br />

impacts<br />

caused as a<br />

result of the<br />

presence of the<br />

Project<br />

workforce<br />

during<br />

construction<br />

and operation<br />

on community<br />

health and<br />

wellbeing.<br />

Description of mitigation<br />

• Establish a contingency fund to address contamination of<br />

the surrounding environment prior to Project closure;<br />

• Health awareness programme incorporating an<br />

HIV/AIDS awareness and prevention program which<br />

will include voluntary testing, the provision of condoms,<br />

and education of the workforce and local communities;<br />

• Ensure that any victims of health or safety impacts of the<br />

Project are rehabilitated with treatment and support that<br />

can continue after closure of the Project; and<br />

• Consider providing sustainable investment in local health<br />

care facilities during the operation phase to provide<br />

ongoing capacity for support beyond the life of the<br />

Project.<br />

Performance<br />

Indicator<br />

Adherence to<br />

the <strong>IFC</strong><br />

Performance<br />

Standards<br />

Monitoring<br />

The<br />

Occupational<br />

Health and<br />

Safety<br />

Management<br />

Plan and<br />

Community<br />

Health and<br />

Safety<br />

Management<br />

Plan will set<br />

out<br />

monitoring<br />

requirements<br />

Prior to<br />

closure of the<br />

PPA, a<br />

detailed<br />

Decommissio<br />

ning Plan<br />

should be<br />

prepared.<br />

Timing/<br />

Frequenc<br />

y<br />

Through<br />

out<br />

Operatio<br />

nal Phase<br />

Responsibility<br />

The<br />

Occupational<br />

Health and<br />

Safety<br />

Management<br />

Plan and<br />

Community<br />

Health and<br />

Safety<br />

Management<br />

Plan will set out<br />

monitoring<br />

requirements.<br />

<strong>Azura</strong> <strong>Power</strong><br />

will be<br />

responsible for<br />

preparing the<br />

detailed<br />

Decommissioni<br />

ng Plan<br />

Estimated<br />

Cost (USD)<br />

Negligible<br />

(without<br />

contaminatio<br />

n)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!