contract workers. An additional number of employment and contract<br />

opportunities will be required for Project servicing and support, and will be<br />

generated through local economic development and investment. Through<br />

targeted training and capacity building, the Project expects that the majority of<br />

jobs during the operation phase will be offered locally, as a priority, or<br />

regionally. This is expected to have a significant impact on local employment<br />

levels and local economic development.<br />

Decommissioning will necessitate elimination of employment positions and<br />

subcontracts directly associated with the Project, as well as related economic<br />

activities in the region.<br />

<strong>Impact</strong> Significance<br />

Positive impacts to employment and economy during the operation phase of<br />

the Project could be of major significance, bringing much needed development<br />

and opportunities to the area. This means, though, that the impact of<br />

decommissioning on the employment and economic situation of the area<br />

could be of equal significance, and negative. This could go beyond simple<br />

reversal of positive impacts, as Project activities will have made it impossible<br />

for people to return to the primarily agricultural livelihoods practiced before<br />

Project development. Particular issues could include:<br />

• Loss of direct and contracted employment positions and service/supply<br />

contracts;<br />

• Loss of indirect business opportunities and associated employment;<br />

• Decline in economic productivity and household income; and<br />

• Decline in regional and local economic activity.<br />

The extent of impacts will be regional, since the majority of the affected<br />

workforce and businesses will be regionally-based. Without initiatives to<br />

encourage development and economic diversification, the duration of impacts<br />

would be long term, if not permanent. The probability of the impacts<br />

occurring, based on pre-Project levels of economic activity, is considered to be<br />

likely and the overall magnitude is considered to be moderate.<br />

Because the Project will have reduced the viability of agriculture as an<br />

alternative livelihood in the area, the sensitivity rating for receptors of this<br />

impact is moderate - high.<br />

As such, the significance of the impact of Project decommissioning on<br />

employment and economy is considered to be negative and minor.<br />

7.13.4 <strong>Impact</strong> Description and Significance: Summary<br />

Table 7.25 provides a summary of the significant impacts likely to arise during<br />

construction, operation and decommissioning prior to the implementation of<br />

mitigation measures (see Chapter 8).<br />

AZURA EDO IPP<br />

7-68<br />

DRAFT EIA REPORT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!