Ref<br />

#<br />

Potential impact Desired<br />

Outcome<br />

4.12 As with the<br />

construction and<br />

operation<br />

phases the<br />

potential<br />

workplace<br />

health and safety<br />

impacts will be:<br />

• Accidents due<br />

to the<br />

increased<br />

presence of<br />

temporary<br />

workforce;<br />

• Traffic related<br />

accidents;<br />

• Safety related<br />

to the<br />

dismantling<br />

of cables and<br />

pylons, and<br />

explosions<br />

from gas<br />

pipeline; and<br />

• Health<br />

impacts of<br />

workforce<br />

interacting<br />

with the<br />

surrounding<br />

communities<br />

(particularly<br />

temporary<br />

workforce)<br />

Minimise any<br />

potential<br />

accidents that<br />

may occur<br />

during<br />

decommissioni<br />

ng particularly<br />

with<br />

demolition<br />

and removal<br />

activities<br />

Description of mitigation<br />

• Conduct toolbox talks on a daily basis;<br />

• The provision and use of PPE at all times during<br />

decommissioning;<br />

• Warning signs in place, including those for the electrical<br />

and mechanical equipment safety warning, and chemical<br />

hazard warning;<br />

• Ensure that all employees (including contractors) are<br />

aware and adhere to health and safety procedures;<br />

• Review health and safety procedures of any additional<br />

contractors that may be employed during<br />

decommissioning; and<br />

• Ensure that any victims of incidents on site are<br />

rehabilitated with treatment and support that can<br />

continue after closure of the Project if necessary.<br />

• Plan decommissioning and site rehabilitation techniques<br />

to reduce potential breeding grounds for disease vectors<br />

and implement spray programme if necessary.<br />

Performance<br />

Indicator<br />

Nigerian<br />

H&S law<br />

(Nigerian<br />

Institute of<br />

Safety<br />

Professionals,<br />

Factories Act<br />

1990), the<br />

adherence to<br />

the <strong>IFC</strong><br />

Occupational<br />

Health and<br />

Safety<br />

Guideline<br />

and incidents<br />

record<br />

Monitoring<br />

Emergency<br />

Response<br />

Plan,<br />

Occupational<br />

Health and<br />

Safety<br />

Management<br />

Plan,<br />

Employment<br />

and<br />

Workforce<br />

Policy and<br />

Spill<br />

Response<br />

Plan<br />

will set out<br />

monitoring<br />

requirements<br />

Timing/<br />

Frequenc<br />

y<br />

Through<br />

out<br />

decommi<br />

ssioning<br />

Responsibility<br />

<strong>Azura</strong> <strong>Power</strong><br />

will have the<br />

responsibility to<br />

prepare the<br />

plans, within<br />

the plans<br />

individual<br />

responsibilities<br />

will be detailed<br />

including<br />

contractor<br />

responsibilities<br />

Estimated<br />

Cost (USD)<br />

All costs will<br />

be<br />

incorporated<br />

into the<br />

decommissio<br />

ning phase