Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

damage or endanger any Work by cutting, digging or otherwise, and shall not cut or alter the Work of any other<br />

Contractor without the consent of Owner.<br />

32. SAMPLES TO BE SUBMITTED. Contractor shall furnish to Owner, at Owner’s offices and for Owner’s<br />

approval, when requested, samples of all materials to be used in the execution of the Work herein described, and of<br />

the finish to be given to the several parts. All materials furnished for incorporation in the Work must be fully equal<br />

to the approved samples.<br />

33. OWNER’S OPTIONS. Where the Contract Documents specify a particular type or brand of material or<br />

equipment Contractor shall figure the price of the make or style specified. If Contractor prefers to use any substitute<br />

article or material which Contractor believes to be equal, Contractor shall so state in its bid, giving the price to be<br />

added to or deducted from its base bid price. The final selection will rest with Owner.<br />

34. QUALITY OF MATERIAL AND WORKMANSHIP. Should any dispute arise as to the quality or<br />

fitness of materials or workmanship, the decision as to acceptability shall rest strictly with Owner, based on the<br />

requirement that all Work done or materials furnished shall be first class in every respect. Contractor’s obligations<br />

with respect to the Work shall not be limited in any way by considerations of what is usual or customary in erecting<br />

other buildings.<br />

35. GLASS DAMAGE AND CLEANING. Immediately before turning the Work over to Owner, Contractor<br />

shall replace all damaged glass and have all glass washed clean by professional washers.<br />

36. CORRECTION OF DEFECTIVE, NON-CONFORMING OR DAMAGED WORK PRIOR TO<br />

COMPLETION OF THE WORK. All defective or non-conforming materials or workmanship or Work which<br />

becomes damaged after it is in place in the Building prior to completion of the Work shall be immediately removed,<br />

reconstructed or refinished by Contractor. Except for Work damaged by Owner’s sole negligence, the expense of<br />

doing so or the cost of delays and of making good other Work affected by the changes shall be borne by Contractor,<br />

and no extension of time will be allowed for the correcting of faulty or damaged work. It is not incumbent upon<br />

Owner to give notice of the rejection of faulty or damaged work. If, however, Contractor does not remove the faulty<br />

or damaged Work within a reasonable time after notice from Owner, Owner may remove at the expense of<br />

Contractor.<br />

37. INSPECTION OF OWNER’S EQUIPMENT, MACHINERY, FIXTURES AND MERCHANDISE.<br />

Contractor agrees to let Owner place and install as much equipment, machinery, fixtures and merchandise during the<br />

progress of the Work as is possible before the completion of the various parts of the Work. Contractor further<br />

agrees that such placing and installation of same does not in any way evidence the completion of the Work or any<br />

portion of it, nor signify Owner’s acceptance of the Work or any part of it.<br />

Owner will attempt to interfere as little as possible with the Work of the trades in and about the Building, but<br />

Contractor shall not make any claims to Owner due to such interferences.<br />

38. MOVING MATERIALS. If it becomes necessary at any time during construction to move materials<br />

which are to enter into the construction, or equipment which has been temporarily placed, Contractor shall, when<br />

directed by Owner’s Representative, move them or cause them to be moved without additional charge to Owner.<br />

Once such materials and equipment are stored at the Project site they cannot be removed without Owner’s<br />

permission.<br />

Contractor shall provide a roadway completely around the footprint of the Building, as soon as possible after<br />

construction begins, to provide access for heavy fire department equipment.<br />

Automobiles, trucks and other motor vehicles will not be allowed to park within the perimeter of the Building,<br />

at any time, except when directly involved in the construction with the operator responsible for the vehicle present<br />

and with Owner’s permission.<br />

39. CLEANING. It shall be the duty of each Contractor and its respective Subcontractors to keep the<br />

building and adjoining premises free at all times from accumulations of waste material or rubbish caused by the<br />

respective employees and Work of each. All waste material, including all garbage, rubbish, debris, and broken<br />

concrete, shall be removed from the Premises as soon as possible and not allowed to excessively accumulate. All<br />

combustible debris shall be removed from all buildings at the close of every working day. All other debris shall be<br />

{00052658.DOC;1}<br />

STANDARD GENERAL CONDITIONS – MULTI-DRAW CONTRACT 01001 - Page 19 of 23